My WebLink
|
Help
|
About
|
Sign Out
RES 95024X
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
1990-1999
>
1995
>
RES 95024X
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2012 11:10:33 AM
Creation date
2/25/1999 5:48:59 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
2/21/1995
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
335
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Action Plan ' <br /> <br /> Tri-Va!ley Action Plan <br /> Highways <br /> <br /> Key Locations <br /> <br /> Facility-' 1-680 North of Livorna at Bollinger South of 1-580 South of Route 84 __ <br /> <br /> Existing Configuration 6 lanes 6 lanes 6 lanes 6 lanes <br /> Existing Volume~ 7,100 5,000 4,800 6.000 <br /> Existing V/C 1.08 0.76 0.73 0.91 -- <br /> <br /> 2010 Expected Network <br /> Planned changes: HOV lanes, SR 24 to Dublin---under construction; auxiliary lanes, Diablo to Bollinger; SB to EB tlyover and -- <br /> Dublin hook ramps at 1-680/1-580 interchange; improve interchange at Alcosta; add interchange at West Las Positas <br /> <br /> 2010 Configuration 6 + HOV 6 + HOV + Aux. 6 6 <br /> <br /> Volume 7,800 (constrained) 6,300 5,800 6,600 (constrained) <br /> Transit Service (buses/hour both di* 10 36 24 30 <br /> rections) <br /> Transit Ridership (peak hour) 365 203 13 0 <br /> V/C constrained [before Action Plan} 1.00 (1.39) 0.70 0.87 1.00 (1.47) <br /> (unconstrained) <br /> 8 hours of congestion 7 hours of congestion <br /> <br /> Traffic Pattern Danville 31% Dublin 12% Pleasanton 28% Pleasanton 30% <br /> San Ramon 20% Pleasanton 18% Dublin 20% Livermore 27% -- <br /> CCC 18% Livermore 11% Livermore 5% Dublin 13% <br /> Dublin 17% Danville 6% CCC 9% CCC 5% <br /> Pleasanton 6% San Ramon 38% Danville 8% Through 19% <br /> Livermore 4% CCC 0% San Ramon 14% Danville 3% -- <br /> Through 15% Through 15% Through 15% San Ramon 4% <br /> <br /> TSO to be achieved None--Not within V/C = 0.99 V/C = 0.99 No more than five <br /> TVTC control hours of congestion <br /> <br /> Recommended Actions 1. Support major transit 1. Pursue funding for 1. Pursue funding 1. Advocate HOV <br /> investment (w/Central auxiliary lanes. for 1-580/I-580 lanes, Route 84 to <br /> County). interchange. Sunol Grade. <br /> <br /> 2. Support commute 2. Pursue funding lor 2. Advocate HOV 2. Advocate express <br /> alternatives Alcosta interchange lanes Alcosta to bus service. <br /> (Bay Areawide). improvements. Route 84. <br /> 3. Oppose increases to 3. Support commute _ <br /> mixed-tlow capadty. altomatives <br /> 4. Oppose increases <br /> to mixed-flow capaci- <br /> ty. <br /> <br /> Note: A deficiency plan will be required if the level ol service becomes LOS F on any segment. <br /> <br />Barton-Aschman Associates, Inc. 168 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.