Laserfiche WebLink
Action Plan <br /> <br /> Tri-Va!ley Action Plan <br /> Highways (Continued) <br /> <br /> Key Locations <br /> <br />-- Facility: Bollinger Canyon Road East of 1-680 East of Alcosta <br /> Potential Actions <br /> <br /> Highway Solution Add free right-turn Widen intersection <br /> lane SB on Sunset. at Alcosta to 6 <br /> lanes on Bollinger. <br /> <br /> Transit Solution 16 additional peak- 16 additional peak- <br /> hour buses; must be hour buses; must <br />-- full. be full. <br /> <br /> TDM Solutjon Restrict DV peak-hour Restrict DV peak- <br />' trip generation to 77% hour trip generation <br /> of normal. to 77% of normal. <br /> <br /> Land Use Solution Reduce DV 2010 Reduce DV 2010 <br /> development by 3,600 development by <br /> units. 3,600 units. <br /> <br /> Policy Solution Accept LOS F at Bol- Accept LOS F at <br /> linger/Sunset. Bollinger <br /> Canyon/Alcosta <br /> intersection. <br /> <br />' Barton-Aschrnan Associates, Inc. 193 <br /> <br /> <br />