Laserfiche WebLink
Action Plan <br /> <br /> Tri-Va!ley Action Plan <br /> Highways (Continued) _ <br /> <br /> PM Peak-Hour 2010 Expected Intersection LOS Without Action Plan <br /> V/G LOS <br /> <br /> Bollinger Canyon Road and Sunset Boulevard 1,14 F <br /> Bollinger Canyon Road and Dougherty Road (North) 1.11 F <br /> Bollinger Canyon Road and 1-680 SB Ramps 0.34 A __ <br /> Bollinger Canyon Road and 1-680 NB Ramps 0.71 C <br /> Bollinger Canyon Road and Dougherty Road (South) 0.47 A <br /> Bollinger Canyon Road and Windemere Parkway 0.70 B <br /> Bollinger Canyon Road and Camino Ramon 0.88 D <br /> Bollinger Canyon Road and San Ramon Valley Boulevard 0.46 A <br /> Bollinger Canyon Road and Crow Canyon 0.63 B <br /> Bollinger Canyon Road and AIcosta 1.06 F <br /> <br /> Volumes and capacity refer to PM peak-hour, peak-direction of flow, <br /> <br />Barton-Aschman Associates, Inc. 192 <br /> <br /> <br />