Laserfiche WebLink
Action Plan <br /> <br /> Tri-Valley Action Plan <br /> Highways (Continued) <br /> <br /> Key Locations <br /> <br /> Facility: San Ramon Road North of Dublin <br /> <br /> Existing Configuration 4 lanes <br /> Existing Volume~ 1,200 <br /> Existing V/C 0.33 <br /> <br />-- 2010 Expected Network <br /> Planned changes: None. <br /> <br /> 2010 Configuration 4 lanes <br /> Volume 1.000 <br /> Transit Service (buses~hour both directions) 4 <br />__ Transit Ridership (peak hour) 7 <br /> V/C constrained [before Action Plan] 0.28 <br /> (unconstrained) <br /> <br /> Traffic Pattern Danville 5% <br /> Dublin 55% <br /> San Ramon 23% <br /> Pleasanton 2% <br /> Livermore 10% <br /> CCC 5% <br />-- Through 0% <br /> <br /> TSO to be achieved V/C < 0.90 at <br />' intersections <br /> <br /> _ Recommended Actions None. <br /> <br /> PM Peak-Hour 2010 Expected Intersection LOS Without Action Plan <br /> V/C LOS <br /> <br /> Sen Ramon Road and Dublin Boulevard 0.90 D C <br /> San Ramon Road and Arnador Valley Road 0.45 A C <br /> <br /> Volumes and capacity refer to PM peak-hour, peak-direction of flow. <br /> <br />' Barton-Aschman Associates, Inc. 203 <br /> <br /> <br />