Laserfiche WebLink
Action Plan -- <br /> <br /> Tri-Valley Action Plan <br /> Highways (Continued) <br /> <br /> Key Locations <br /> <br /> Facility: Hopyard Road at Stoneridge <br /> <br /> Existing Configuration 6 lanes <br /> Existing Volume~ 2,400 <br /> Existing V/C ,. 0.44 <br /> <br /> 2010 Expected Network <br /> Planned changes: Widening to 4 lanes between Valley and Division. <br /> <br /> 2010 Configuration 6 lanes ' <br /> Volume 2,400 <br /> Transit Service (buses/hour both di- 20 <br /> rections) __ <br /> Transit Ridership (peak hour) 78 <br /> V/C constrained [before Action Plan] 0.44 <br /> (unconstrained) <br /> <br /> Traffic Pattern Pleasanton 64% <br /> Dublin 23% <br /> Danville 1% <br /> San Ramon 2% <br /> CCC 6% <br /> Livermore 4% __ <br /> Through 0% <br /> <br /> TSO to be achieved V/C < 0.90 at inter- <br /> sections <br /> <br /> Recommended Actions 1. Enforce existing <br /> growth controls in <br /> Pleasanton to insure <br /> achievement of TSOs. <br /> 2. Build adequate <br /> Route 84 to reduce <br /> cut-through traffic from <br /> West Las Positas <br /> Boulevard. <br /> 3. Install traffic signal <br /> phase ovedap at <br /> Hopyard/W. Las <br /> Positas. <br /> <br />Barton-Aschman Associates, Inc. 204 ' <br /> <br /> <br />