Laserfiche WebLink
-- Action Plan <br /> <br /> Tri-Valley Action Plan <br /> Highways (Continued) <br /> <br /> PM Peak-Hour 2010 Expected Intersection LOS Withoul Action Plan <br /> V/C LOS <br /> <br /> Hopyard Road and Owens Ddve 0.85 D <br /> Hopyard Road and Stoneridge Drive 0.58 A <br /> Hopyard Road and 1-580 EB Ramps 0.79 C <br /> Hopyard Road and West Las Positas 0.91 E <br /> Hopyard Road and Valley Avenue 0.66 B <br /> <br /> ~ Volumes and capacibJ refer to PM peak-hour, peak-direction of flow. <br /> <br /> Key Locations <br /> <br /> Facility: Hopyard Road at Stoneridge <br /> Potential Actions <br /> <br /> Highway Solution Widen Hopyard Road <br /> to 8 lanes. Build ade- <br /> quate Route 84 ID <br /> reduce cut-through <br /> traffic from West Las <br /> Positas Boulevard. <br /> Install traffic signal <br /> phase overlap at <br /> Hopyard/W. Las <br /> Positas. <br /> <br /> Transit Solution Increase local bus <br /> ridership. <br /> <br />__ TDM Solution Increase overall AVR <br /> by about 2%. <br /> <br /> Land Use Solution Reduce development <br /> in Pleasanton by <br /> about 20/0, focused on <br /> vicinity of Hopyard <br /> Road. <br /> <br /> Policy Solution Accept LOS E (0.91) <br /> at intersection ol <br /> Hopyard/Las Positas. <br /> <br /> ' Barton-Aschman Associates, Inc. 205 <br /> <br /> <br />