Laserfiche WebLink
Action Plan ' <br /> <br /> Tri-Valley Action Plan <br /> Highways (Continued) <br /> <br /> Key Localions <br /> <br /> Facility: Stanley Boulevard at Valley Avenue <br /> <br /> Existing Configuration 4 lanes <br /> Existing Volume' 800 <br /> Existing V/C 0.22 <br /> <br /> 2010 Expected Network <br /> Planned changes: Grade separation at intersection with Isabel (pan of Route 84 project). <br /> <br /> 2010 Configuration 4 lanes <br /> Volume 1,200 <br /> Transit Service (buses/hour both di- 4 <br /> rections) _ <br /> Transit Ridership (peak hour) 41 <br /> V/C constrained ]before Action Plan] 0.33 <br /> (unconstrained) <br /> <br /> Traffic Pattern Livermore 50% <br /> Pleasanton 25% <br /> Through 25% <br /> Danville 0% <br /> Sen Ramon 0% <br /> CCC 0% <br /> Dublin 0% -- <br /> <br /> TSO to be achieved V/C < 0.90 at inter- <br /> sections <br /> <br /> Recommended Actions 1. At Valley/Stanley _ <br /> intersection, widen for <br /> EB double left-turn <br /> lanes. <br /> 2. Reduce cut-through <br /> traffic with adequate <br /> Highway 84. <br /> <br />Barton-Aschman Associates, Inc. 208 ' <br /> <br /> <br />