Laserfiche WebLink
Technical Procedures <br /> <br /> 7.3 SUPPLEMENTAL ANALYSIS OF DELAY <br /> <br /> Because the CCTA Level of Service method applies fixed critical lane volumes <br />uniformly throughout the county, the method may underestimate congestion at locations with <br />poor geometries (older intersections with poor turning radii and small approach widths), or -- <br />overestimate congestion at locations with excellent geometries (newer intersections with ideal <br />conditions) and aggressive drivers. The selected method may not identify locations where <br />severe congestion is limited to a single intersection approach, nor does it reflect significant -- <br />peaking and congestion within the peak hour. <br /> <br /> To address these shortcomings, the following supplemental analyses may be ' <br />performed jn ;~Clition to usin~ the CCTA's method to identify congested locations: <br /> <br /> Field measurement of delay on the congested approach or full ' <br /> intersection can be collected using the methodology described in <br /> Chapter 9, Appendix III of the 1985 Highway Capacity Manual <br /> (HCM). The measured delay should be compared with those <br /> provided in Table 9-1 of the HCM. <br /> <br /> The summary of intersection levels of service should be supplemented to reflect <br />the results of the delay analyses when significant variations are found. <br /> <br /> 7.4 LEVEL OF SERVICE CALCULATION METHOD <br /> <br /> Signalized intersection levels of service should be calculated using the following <br /> nine steps: <br /> <br /> STEP 1: Lane Geometry <br /> <br /> Identify the number and type of lanes for each approach. <br /> <br /> STEP 2: Intersection Volumes <br /> <br /> Identify by counting (if analysis of existing conditions) or estimating (if analysis _ <br /> of future conditions) left-turn, through, and right-turn volumes for each approach for the peak <br /> (design) hour volumes in vehicles per hour for each peak hour to be analyzed. In most cases, <br /> the analysis will assess both the AM and PM weekday peak hour. For projects with peak -- <br /> periods that occur during midday or on weekends, additional time periods should be analyzed. <br /> <br /> <br />