Laserfiche WebLink
1) Gather all construction debris on a regular basis and place them in a dumpster <br /> or other container which is emptied or removed on a weekly basis. When <br /> appropriate, use tarps on the ground to collect fallen debris or splatters that <br /> could contribute to storm water pollution. <br /> <br /> 2) Remove all din, gravel, rubbish, refuse, and green waste from the street <br /> pavement, and storm drains adjoining the project site. During wet weather <br /> avoid driving vehicles off paved areas. <br /> <br /> 3) Broom sweep the public street pavement adjoining the project site on a daily <br /> basis. Caked-on mud or dirt shall be scraped from these areas before <br /> sweeping. <br /> <br /> 4) Never clean machinery, tools, brushes, etc., or rinse containers into a street, <br /> gutter, or storm drain. <br /> <br /> 5) Install filter materials (such as sandbags, filter fabric, etc.) at the storm drain <br /> inlet nearest the downstream side of the project site in order to retain any <br /> debris or dirt flowing into the City storm drain system. Filter materials shall <br /> be maintained and/or replaced as necessary to ensure effectiveness and to <br /> prevent street flooding. Dispose of filter particles in the trash. <br /> <br /> 6) Create a contained and covered area on the site for the storage of bags, <br /> cement, paints, flammable, oils, fertilizers, pesticicles, or any other materials <br /> used on the project site that have the potential for being discharged to the <br /> storm drain system through being windblown or in the event of a material <br /> spill. <br /> <br /> 7) Ensure that concrete/g unite supply trucks or concrete/plasterers operations do <br /> not discharge wash water into street gutters or drains. <br /> <br /> c. Construction access routes are limited to those previously approved by the City <br /> Engineer and shall be provided to all sub-contractors, delivery personnel, etc. <br /> <br />PUD-92-4-1M: Chu/Standard Pacific April 19, 1995 <br />Exhibit 'B ", Conditions of Approval Page 8 <br /> <br /> <br />