Laserfiche WebLink
e. Dust and mud shall be contained within the boundaries of the property during times <br /> of construction. <br /> <br /> 6. Fire Protection Requirements: <br /> <br /> a. The houses covered by PUD-92-4-1M shall the meet the fire and security require- <br /> ments in Chapters 20.24 and 20.36 of the Pleasanton Municipal Code. <br /> <br /> b. The site shall be kept free of fire hazards from the start of construction to final <br /> inspection. <br /> <br /> c. The developer shall ensure that fire protection facilities, including all surface roads, <br /> fire hydrants, and a water supply capable of furnishing the required fire flow is <br /> installed and serviceable prior to and during the time of construction. <br /> <br /> 7. Engineering Requirement: <br /> <br /> The developer shall apply for and receive an encroachment permit prior to moving any <br /> construction equipment onto the individual lots. An erosion control and hazard abatement <br /> cash bond, in the amount of $2,000.00, shall be posted with receipt of the encroachment <br /> permit and shall be maintained throughout the construction period. Any damage to <br /> existing street improvements during construction shall be repaired to the satisfaction of the <br /> City Engineer at full expense to the developer. Repair measures shall include, but not be <br /> limited to, slurry seal, overlay, street reconstruction, etc., deemed warranted by the City <br /> Engineer. <br /> <br />8. Best Management Practice Program: <br /> <br /> a. The developer shall submit a construction Best Management Practice (BMP) <br /> program for review and approval by the Planning Director prior to issuance of the <br /> first building permits. These BMP's shall be implemented by the general contractor <br /> and all subcontractors and suppliers of materials and equipment. Construction site <br /> cleanup and control of construction debris shall also be addressed in this program. <br /> Failure to comply with the approved construction BMP may result in the issuance <br /> of correction notices, citations, or a project stop work order. <br /> <br /> b. The developer is responsible for implementing the following measures during all <br /> construction phases of the subject project: <br /> <br />PUD-924-1M: Chu/Standard Pacific April 19, 1995 <br />Exhibit "B", Conditions of Approval Page 7 <br /> <br /> <br />