My WebLink
|
Help
|
About
|
Sign Out
RES 95097
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
1990-1999
>
1995
>
RES 95097
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/13/2012 1:55:52 PM
Creation date
2/26/1999 4:46:14 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
8/15/1995
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Action Plan <br /> <br /> Tri-Valley Action Plan <br /> Highways (Continued) <br /> <br /> Key Locations <br /> <br /> Facility: TasMjara Road North of 1-580 North of Dublin North of Failon <br /> <br /> Existing Configuration 2 lanes 2 lanes 2 lanes <br /> Existing Volume' 200 200 200 <br /> Existing V/C 0.11 0.11 0.11 <br /> <br /> 2010 Expected Network <br /> Planned changes: Widening to 8 lanes from 1-580 to Dublin Boulevard, 6 lanes north of Dublin Boulevard to County Line, 4 lanes <br />._ north of County line. <br /> <br /> 2010 Configuration 8 lanes 6 lanes 6 lanes <br /> Volume 3,700 3,750 2,600 <br /> Transit Service (buses/hour both di- 18 20 <br /> rections) <br /> Transit Ridership (peak hour) 1,066 84 120 <br /> VIC consgained {before Action PlanJ 0.51 0.69 0.48 <br /> (uncorksrained) <br /> <br /> Traffic Pattam Danvilla 0% Danvii/ 0% Danville 1% <br /> San Ramon 0% San Ramon 0% San Ramon 6% <br /> Dublin 35% Dublin 1 35% Dublin 17% <br /> CCC 36% CCC 36'Yo Pleasanton 14°/° <br /> Pleasanton 18% Pleasanton 18% CCC 58% <br /> Livermore 10% I_ivermore2 10"/o Liven'nore 4% <br /> Through 0% Through 0% <br /> <br /> TSO to be achieved V/C < 0.90 at intersections, V/C < 0.90 at inter- V/C < 0.90 at intersections. <br /> sections. <br /> <br /> Recommended Actions5 1. Sacurn developer funding for 1. Secure developer fund- None. <br /> widening. ing for widening. <br /> 2. F~t Consider puffing in place <br /> mutually agreed and equitable <br /> muffijurisdictional growth man- <br /> agemanL ~ 5.-.:'_'r; <br /> <br /> 3. Consider widening or ex- <br /> panding the highway network, <br /> improving transit service, or <br /> improving ranspertation de- <br /> mand management. <br /> <br /> PM Peak-Hour 2010 Expected Intermllon LOS Without Action Plan VIC LO~ <br /> <br /> Tassajam Road and Fallon Road 0.76 C <br /> Tassajara Rood and Highland Road 0.65 B <br /> Tassajara Road and Dublin Boulevard 1.05 F <br /> Tassajara Road and Gleason Avenue 0.70 B <br /> Tassajara Road and 1o580 WB Ramps 0.84 D <br /> ' Volumes and capacity refer to PM peak-hour, peak-direction of flow. <br /> 2 Furlher actions shall be identified by the TSO Management Study at its completion. <br /> <br /> Barton-Aschman Associates, Inc. 197 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.