My WebLink
|
Help
|
About
|
Sign Out
RES 95097
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
1990-1999
>
1995
>
RES 95097
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/13/2012 1:55:52 PM
Creation date
2/26/1999 4:46:14 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
8/15/1995
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REQUEST FOR PROPOSALS <br /> TRI-VALLEY TRANSPORTATION COUNCIL <br /> COMBINED STUDY <br /> July 1995 <br /> <br /> 1.4 MODEL OUTPUT <br /> <br /> The objective of this task is to provide model output plots, <br /> consisting of ADT, AM, PM peak hour volumes for road segments <br /> and intersections. V/C calculations, using the VCCC system, <br /> shall be provided for "Model intersections,,, (same as used in <br /> TVTP/AP) not meeting LOS "D" conditions. Outputs will be <br /> subject to TVTAC and local jurisdiction review prior to final <br /> publication. <br /> <br />TASK II TRANSPORTATION SERVICE OBJECTIVE (TSO) MANAGEMENT STUDY <br /> <br /> One of the major recommendations of the TVTP/AP is the <br /> resolution of projected TSO violations at approximately <br /> fifteen (15) intersections of Regional Significance as shown <br /> in the attached list taken from page 232 of the Plan, and the <br /> final "Expected 2010" Tri-Valley model run of June 1995. The <br /> rerun of the Model using ABAG '94 Land Use Projections may <br /> change this list. The intent of this task is to further refine <br /> the nature of the problem and to address those locations where <br /> violations are projected. The focus will be to develop a menu <br /> of options at each location from which affected jurisdictions <br /> may choose feasible solutions to resolving TSO violations at <br /> these locations. <br /> <br />2.1 DEFINE TSO PROBLEMS <br /> <br /> The (TVTP/AP) contains a set of specific actions which could <br /> be taken, in whole or in part, to improve the projected TSO <br /> violation on each affected Route of Regional Significance to <br /> improve the intersection to an acceptable level. <br /> Implementation of any one action within the set of <br /> recommendations generally would not be sufficient to resolve <br /> the TSO violation. Therefore, additional study to refine the <br /> nature of problem and recommended actions are required. <br /> <br /> 2.1.1 Review existing and proposed roadway and geometry <br /> <br /> 2.1.2 Conduct select link analysis of each affected <br /> intersection using approved Tri-Valley Model. <br /> <br /> 2.1.3 Determine AM, PM peak period origins and <br /> destinations for each of the seven jurisdictions at <br /> each of the critical locations. <br /> <br /> -5- <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.