My WebLink
|
Help
|
About
|
Sign Out
SR 06:142
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2006
>
SR 06:142
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2006 11:33:17 AM
Creation date
5/12/2006 10:39:44 AM
Metadata
Fields
Template:
CITY CLERK
DOCUMENT DATE
5/16/2006
DESTRUCT DATE
15 Y
DOCUMENT NO
SR 06:142
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />determine CTS presence or absence. If any individuals of the species are <br />encountered, relocation to a burrow located outside of the footprint and <br />any staging areas shall be implemented by a qualified biologist. <br /> <br />. (California red-legged frog, if present). Any construction work within <br />300 feet of the Arroyo de Laguna corridor and the storm water detention <br />basins shall generally be conducted between July 1 and October 15 to <br />minimize impacts on the Califomia red-legged frog. If work must occur <br />outside this time period, additional measures will be needed. <br /> <br />. (Westem pond turtle, if present). Pre-construction surveys shall be <br />conducted for the western pond turtle; if determined to be present on the <br />site, suitable protective measures will be implemented through <br />consultation with CDFG that are based on the specific type of <br />construction activity proposed and the proximity of such activity to the <br />occupied aquatic habitat. <br /> <br />. (Bats). Pre-construction surveys for bats shall be implemented and an <br />exclusion area will be established around any active nests. Bat surveys <br />shall be required if snag and/or tree removal is to occur during the 10 <br />months of breeding and/or occupation of nests (November - August). <br /> <br />. (Raptors). Pre-construction surveys for raptors shall be implemented and <br />an exclusion area will be established around any active nests. Pre- <br />construction raptor surveys shall be required if tree removal and/or <br />construction activities are to occur during the raptor breeding season <br />(February-August). <br /> <br />. (Songbirds). Pre-construction breeding surveys for special status <br />songbirds shall be implemented and an exclusion area shall be established <br />around any active nests until all young have fledged. <br />Specific Plan, p. 74; DEIR, pp. 66.69. <br /> <br />. (Special Status Plant Species). A biological assessment by a qualified <br />biologist shall be conducted at the site of each potential project at the time <br />such a project is planned. If the assessment discloses the presence or pos- <br />sible presence of a special status plant, a plant survey consistent with the <br />survey protocol of appropriate regulatory agencies shall be conducted. <br />Specific Plan, p. 74; Response to Comments, p. 38. <br /> <br />Cultural Resources <br /> <br />Potential damage to cultural resources resulting from ground-disturbing activities <br /> <br />Finding. The City finds that the following mitigation measures are feasible and have <br />been incorporated into the Specific Plan, thereby mitigating the impact to a <br />less-than-significant level: <br /> <br />. A survey for potential cultural resources is to be conducted prior to <br />approval of any grading or development plans, including infrastructure <br /> <br />Bernal Property Phase n Specific Plan and Bernal Community Park Master Plan <br />Environmentallmpact Report Findings and Statement of Overriding Considerations <br /> <br />Page 13 of 23 <br />
The URL can be used to link to this page
Your browser does not support the video tag.