My WebLink
|
Help
|
About
|
Sign Out
SR 06:142
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2006
>
SR 06:142
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2006 11:33:17 AM
Creation date
5/12/2006 10:39:44 AM
Metadata
Fields
Template:
CITY CLERK
DOCUMENT DATE
5/16/2006
DESTRUCT DATE
15 Y
DOCUMENT NO
SR 06:142
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />plans. The survey is to be conducted by a qualified archaeologist walking <br />the site on transects no more than 30 meters apart. The survey is to <br />identify the extent and depth of resource sites prior to approval of final <br />site-specific grading plans. <br /> <br />. Known cultural resources areas are to be avoided by "capping" or, if <br />known sites cannot be avoided or capped consistent with construction of <br />Phase II projects, a Resources Recovery Plan shall be prepared and <br />implemented prior to disturbing the site. <br /> <br />. In the portions of the Phase II Specific Plan area not currently known to <br />contain archaeological resources, a qualified archaeologist is to monitor <br />project grading and site preparation activities. If any cultural resources <br />are uncovered during site preparation activities, land-disturbing activities <br />are to be discontinued within a 35-foot radius until the find can be <br />evaluated by the monitoring archaeologist, appropriate steps have been <br />taken to protect and/or recover the resource( s), and appropriate mitigation <br />can be determined. <br /> <br />. Assure the protection of cultural resources previously or newly identified <br />by (1) providing for preservation via "capping" or (if known sites cannot <br />be avoided), (2) developing and implementing a Resources Recovery Plan <br />at known sites. <br /> <br />Specific Plan, p. 77-78; DEIR, pp. 71-72. <br /> <br />Geolol!:V. Soils. and Seismicity <br /> <br />Exposure of people and property on the site to risks relating to potential geological <br />hazards and adverse soils conditions <br /> <br />Finding. The City finds that the following mitigation measures are feasible and have <br />been incorporated into the Specific Plan, thereby mitigating the impact to a <br />less-than-significant level: <br /> <br />. Development in the Specific Plan area must conform to the Uniform Build- <br />ing Code and other applicable state and local seismic safety regulations. <br /> <br />. Any proposed development in the Specific Plan area must conform to the <br />policies and programs of the Pleasanton General Plan relating to potential <br />adverse soils conditions. The General Plan provisions include: (1) <br />requiring site-specific soils studies for all new development prior to the <br />issuance of building permits and prior to the approval of final <br />improvement plans in areas of specific risks; (2) requiring technical <br />review of such studies by a qualified consulting geotechnical engineer <br />reporting to the City; and (3) permitting development in areas of "high" <br />susceptibility to geologic hazards only when investigations demonstrate <br />that mitigation is feasible through accepted engineering and construction <br />techniques. <br /> <br />Specific Plan, p. 76; DEIR, pp. 75-76. <br /> <br />Bernal Property Phase II Specific Plan and Bernal Community Park Master Plan <br />Environmental Impact Report Findings and Statement of Overriding Considerations <br /> <br />Page 14 of23 <br />
The URL can be used to link to this page
Your browser does not support the video tag.