Laserfiche WebLink
<br />Finding. The City finds that the following mitigation measures are feasible and have <br />been incorporated into the Specific Plan, thereby mitigating the impacts to a <br />less-than-significant level: <br /> <br />. The detention basins on the Phase II Specific Plan site have been sized to <br />accommodate anticipated development. With the adoption of the Bernal <br />Property Phase II Specific Plan, the City will revalidate the design <br />assumptions to confirm the basin sizes. <br /> <br />. All drainage components will be designed in compliance with City of <br />Pleasanton standards, and the Department of Public Works will review <br />grading and drainage plans to assure compliance. <br /> <br />. All Specific Plan projects covered by Provision C.3.f of the County <br />NPDES Permit shall fully comply with permit requirements. <br />Specific Plan, p. 74-76; DEIR, pp. 87-89; Responses to Comments, p. 30. <br /> <br />2. Potential degradation of surface water quality from runoff during construction and <br />operation ofthe Project <br /> <br />Finding. The City finds that the following mitigation measures are feasible and have <br />been incorporated into the Specific Plan, thereby mitigating the impact to a <br />less-than-significant level: <br /> <br />. A Storm Water Pollution Prevention Plan (SWPPP) is to be prepared and <br />implemented to reduce potential impacts on surface water quality through <br />the construction period of the Project. <br /> <br />. All Specific Plan projects covered by Provision C.3.f of the County <br />NPDES Permit shall fully comply with permit requirements. <br />Specific Plan, p. 75; DEIR, pp. 89-90. <br /> <br />3. Potential degradation of groundwater resources <br /> <br />Finding. The City finds that the following mitigation measures are feasible and have <br />been incorporated into the Specific Plan, thereby mitigating the impact to a <br />less-than-significant level: <br /> <br />. The design of any modification to the stormwater detention basins shall <br />maintain an adequate distance between the basin floor and the underlying <br />groundwater (generally, 10 feet of unsaturated sediments) or comply with <br />alternative measures approved by the Regional Water Quality Control <br />Board that are equally protective of groundwater quality. <br /> <br />. Projects within the Specific Plan area that might generate pollutants to <br />groundwater (roadways, parking lots) must provide for pretreatment <br />before runoff is released to the detention basins. <br /> <br />. The potential agricultural club would be designed to channel animal waste <br />to the City's sanitary sewer, or to otherwise manage that waste to avoid <br />water pollution. <br /> <br />Bernal Property Phase Il Specific Plan and Bernal Community Park Master Plan <br />Environmental Impact Report Findings and Statement of Overriding Considerations <br /> <br />Page 16 of23 <br />