Laserfiche WebLink
<br />Hazards and Hazardous Materials <br /> <br />Potential exposure of construction workers and future site to hazardous materials that <br />may be on the site and that could pose an unacceptable risk <br /> <br />I. Impacts relating to potential existing contamination sources <br /> <br />Finding. The City finds that the following mitigation measures are feasible and have <br />been incorporated into the Specific Plan, thereby mitigating the impact to a <br />less-than-significant level: <br /> <br />. Preliminary studies of soils and groundwater are to be conducted prior to <br />approval of final grading plans and, if pollutants in excess of established <br />screening levels are found, contamination conditions are to be remediated <br />or the land use plan revised to avoid adverse effects. <br /> <br />. The Condition of Approval of Bema I Property Phase I development <br />(Condition 38.(e)) relating to radionuclides shall apply to the Phase II <br />Specific Plan. <br /> <br />. New sensitive receptors (such as child care centers) will be subject to <br />siting criteria that adequately protect those uses from such potential haz- <br />ardous materials sources as: (1) prior uses not remediated (e.g., former <br />underground fuel tanks); (2) sites currently or formerly occupied by acti- <br />vities utilizing or handling hazardous materials (and any subsurface <br />contamination associated with those uses); and (3) major streets and high- <br />ways (which may be subject to contamination due to accidental spills). <br />Specific Plan, p. 78-79; DE1R, pp. 81-82. <br /> <br />2. Impacts relating to transport, use, storage, and disposal of hazardous materials <br />during site development and future use <br /> <br />Finding. The City finds that the following mitigation measures are feasible and have <br />been incorporated into the Specific Plan, thereby mitigating the impact to a <br />less-than-significant level: <br /> <br />. A Storm Water Pollution Prevention Plan (SWPPP) is to be prepared and <br />implemented to minimize potential impacts relating to possible hazardous <br />materials releases that could be conveyed in storm water or ordinary <br />runoff (such as through irrigation). <br /> <br />. Plans shall be prepared for facilities that use, store, or handle hazardous <br />materials in quantities exceeding thresholds established by regulatory <br />agencies to assure safety in handling of such materials under normal and <br />emergency conditions. <br /> <br />Specific Plan, p. 78-79; DE1R, pp. 84-85. <br /> <br />Hvdrolol!v, Drainal!e, and Water Qualitv <br />I. Potential to contribute to flooding risk onsite and downstream of the Project <br /> <br />Bernal Property Phase II Specific Plan and Bernal Community Park Master Plan <br />Environmental Impact Report Findings and Statement of Overriding Considerations <br /> <br />Page 15 of23 <br />