My WebLink
|
Help
|
About
|
Sign Out
RES 06035
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
2000-2009
>
2006
>
RES 06035
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2006 4:17:08 PM
Creation date
6/7/2006 4:02:28 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
5/16/2006
DOCUMENT NO
RES 06035
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
377
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Draft Environmental Impact Report <br />Bernal Property Phase II Specific Plan <br /> <br />oped, vegetated lands (the existing condition) generally have lower runoff coefficients than <br />developed lands, meaning that less water leaves the undeveloped site as runoff during <br />normal storm events. Much of the precipitation infiltrates into the subsurface, ponds on the <br />surface, or clings to vegetation to be evaporated later. Impervious surfaces yield nearly all <br />rainfall as runoff because infiltration and surface storage is greatly reduced. Increased <br />runoff volume and the increased rate of delivery of runoff to stormwater conveyances could <br />exceed the capacity of downstream drainage ways, causing localized flooding. <br /> <br />If not mitigated, peak discharges from the site would increase under the proposed project, <br />potentially causing flooding at drainage inlets where culverts are undersized and overbank <br />flooding at creek locations that are flood-prone. Therefore, the proposed project may result <br />in two types of flooding impacts: 1) exceedance of capacity of the individual culverts <br />draining the site and 2) cumulative flooding impacts in downstream creeks that already are <br />prone to flooding. <br /> <br />In addition, alteration of drainage patterns on the site could result in hydromodification <br />impacts on downstream creeks. Hydromodification is defined as the alteration ofthe hydro- <br />logic characteristics of coastal and noncoastal waters that, in turn, could cause degradation <br />of water resources. In the case of a stream channel, this is the process whereby a stream <br />bank is eroded by flowing water. This typically results in the suspension of sediments in the <br />water course. Provision C.3.f of the County NPDES Permit specifies the enhanced require- <br />ments for limiting "the increase of peak stormwater runoff rates." Provision C.3.f.i states <br />that member agencies will: <br /> <br />Manage increases in peak runoff flow and increased runoff volume for all Group 1 Projects <br />where such increased flow and/or volume is likely to cause increased erosion of creek beds <br />and banks, silt pollutant generation, or other impacts on beneficial uses. Such manage- <br />ment shall be through implementation of a Hydrograph Modification Plan (HMP). The <br />HMP, once approved by the Regional Board, shall be implemented so that post-project <br />runoff shall not exceed estimated pre-project rates and/or durations, where the increased <br />stormwater discharge rates and/or durations will result in increased potential for erosion or <br />other significant adverse impacts on beneficial uses, attributable to changes in the amount <br />and timing of runoff. The term duration in this Provision is defined as the period that flows <br />are above a threshold that causes significant sediment transport and may cause excessive <br />erosion damage to creeks and streams. <br /> <br />The Alameda Countywide Clean Water Program (ACCWP) has prepared and submitted a <br />draft Hydrograph Modification Plan (HMP), but the HMP had not been approved by the <br />RWQCB as of the date of publication of this DEIR. Therefore, projects that could result in <br />hydromodification impacts that are approved prior to the approval ofthe final HMP must be <br />evaluated and impacts mitigated, as needed, on a case-by-case basis. Even though the <br />County HMP has not yet been approved, the concepts included in the draft HMP provide an <br />approach to mitigation of potential hydromodification impacts and can be required as part <br />of the CEQA process in advance of the RWQCB approval of the HMP. <br /> <br />The following is an excerpt from the ACCWP's Draft Hydrograph Modification Management <br />Plan Part A: General Provisions For Hydromodification Management: <br /> <br />Stormwater management facilities are often designed to maintain peak flow rates at their <br />pre-development levels to prevent increases in the frequency of flooding due to new <br /> <br />88 <br />
The URL can be used to link to this page
Your browser does not support the video tag.