My WebLink
|
Help
|
About
|
Sign Out
RES 06035
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
2000-2009
>
2006
>
RES 06035
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2006 4:17:08 PM
Creation date
6/7/2006 4:02:28 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
5/16/2006
DOCUMENT NO
RES 06035
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
377
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Draft Environmental Impact Report <br />Bernal Property Phase II Specific Plan <br /> <br />The Phase II Specific plan provides a conceptual park network in the Transportation <br />Element, Figure 5-1, also shown below as Figure 23, p. 136. <br /> <br />. The actual trail alignments would be more precisely aligned as various projects, such <br />as improvement of open space areas including the Grand Meadow, go forward. <br />These trails would be designed to "accommodate abundant pedestrian access <br />throughout the planning area" as described in the Grand Park Element (Trails Policy <br />1, p. 32). <br /> <br />The Phase II Specific Plan area would provide "trails with rest stops and staging areas" that <br />would be part of a "coordinated system of linkages including planted woodland and <br />meadows, restored and recreated channels, vegetated stormwater detention basins and <br />other wetlands, ... and protected view corridors" (Land Use Element, p. 11). <br /> <br />Both the Bernal Community Park and the Phase II Specific Plan trail network are consistent <br />with direction provided in the Phase I Specific Plan. They represent the current level of <br />project planning for these uses, which will reach a greater level of specificity as PUD <br />applications are prepared for individual projects in the sub-areas of the Phase II Specific <br />Plan. <br /> <br />b. Significance Criteria <br /> <br />Significance criteria for the proposed project's impacts on parks and recreation are drawn <br />from CEQA Guidelines Appendix G (Items XIV (a) and (b)). Impacts on parks and <br />recreation would be significant: <br /> <br />(1) [If the project would] increase the use of existing neighborhood and regional parks <br />or other recreational facilities such that substantial physical deterioration of the <br />facility would occur or be accelerated. <br /> <br />(2) [If the project would] include recreational facilities or require the construction or <br />expansion of recreational facilities which might have an adverse physical effect on <br />the environment. <br /> <br />c. Impacts <br /> <br />(1) Increase the Use of Existing Parks <br /> <br />The implementation of the Phase II Specific Plan and the BCP Master Plan, in line with the <br />direction given in the Phase I Specific Plan, would add substantially to Pleasanton's array of <br />recreation and park resources. In particular, it would add to the City's supply of community <br />park and open space facilities. <br /> <br />Pleasanton operates City parks, including Community Active Use Parks (three acres per <br />thousand residents), Community Special Use Parks (one acre per thousand residents), <br />and Community Open Space Parks (four acres per thousand residents). <br /> <br />126 <br />
The URL can be used to link to this page
Your browser does not support the video tag.