My WebLink
|
Help
|
About
|
Sign Out
RES 06035
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
2000-2009
>
2006
>
RES 06035
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2006 4:17:08 PM
Creation date
6/7/2006 4:02:28 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
5/16/2006
DOCUMENT NO
RES 06035
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
377
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Chapter 4 <br />Environmental Setting, Impacts, and Mitigation Measures <br />P. Utilities and Service Systems <br /> <br /> <br />This section reviews the infrastructure system of the Phase II Specific Plan area, sets forth <br />criteria for evaluating the significance of infrastructure plans and facilities, and evaluates <br />whether provision of the Phase II infrastructure to the project site would result in adverse <br />environmental effects. <br /> <br />1. Framework for Analysis <br /> <br />The Phase II Specific Plan site lies within the central area of Pleasanton. It is surrounded by <br />established land uses (see Chapter 4. Land Use for a description of nearby uses) to which <br />infrastructure has been extended over time as they have developed. <br /> <br />The Bernal Phase II Specific Plan area adjoins the Phase I Specific Plan area. The Phase I <br />Specific Plan addressed infrastructure needs of the entire Bernal Property, in the expectation <br />that future land use decisions would require a comprehensive infrastructure plan. The <br />Public Facilities and Service Element of the Phase I Specific Plan called for the provision of <br />the complement of "backbone" infrastructure: <br /> <br />"Backbone infrastructure" includes neighborhood and major collector streets <br />necessary for purposes of providing ingress and egress, water transmission lines, <br />wastewater trunk lines, primary underground utility lines and storm drainage <br />facilities. <br /> <br />The Phase I advance planning and provIsion of backbone infrastructure establish the <br />essential physical and policy framework for utilities on the Phase II Specific Plan site. <br /> <br />2. Setting <br /> <br />In looking ahead to the time the Bernal Property would be fully planned and development- <br />ready, the Phase I Specific Plan set forth basic infrastructure plans for Phase I and II sites: <br /> <br />. Water Supply System. Installation of an onsite potable water distribution system <br />consistent with the City's Master Plan and meeting City design standards. This <br />system is illustrated in Figure 24 (from the Phase II Specific Plan, Figure 5-1). <br /> <br />Phase I development was required to install the backbone water mains in (a) Valley <br />Avenue, (b) Oak Vista Parkway, (c) West Lagoon Road, (d) Laguna Creek Lane, and (e) <br />an alignment connecting that same road link to Case Avenue (through the Phase I resi- <br />dential development in the Eastern Area), including a water main in the roadway under- <br />pass ofthe Union Pacific Railway tracks that provides an extension of Valley Avenue to <br />junipero Street and Case Avenue. <br /> <br />. Wastewater Collection. Installation of an onsite sewage collection system consistent <br />with City design standards. This system is illustrated in Figure 25 (from the Phase II <br />Specific Plan, Figure 5-2). <br /> <br />153 <br />
The URL can be used to link to this page
Your browser does not support the video tag.