Laserfiche WebLink
<br />Draft Environmental Impact Report <br />Bernal Property Phase II Specific Plan <br /> <br />Impact <br />02. Development under the <br />Specific Plan would result in <br />exceedances of service criteria <br />based on General Plan <br />roadway capacity policies at <br />the locations identified in the <br />text. <br /> <br />Mitigation Measure <br />02. Add one additional travel lane <br />in the impacted direction of <br />the identified roadway seg. <br />ments, and plan and finance <br />the identified improvements <br />through the update of the <br />traffic impact fee program as <br />called for in Measure 01 c. <br /> <br />Post. <br />Mitigation <br />Significance <br />LS <br /> <br />152 <br />