Laserfiche WebLink
<br />Chapter 5 <br />Alternatives to the Project <br /> <br />. Residential. In the Central Area, the lands in Phase II sub-area 3 and part of sub-area <br />6 that are designated as "Optional Residential" in the Phase I land use diagram. <br /> <br />As described in Chapter 3, the option of adopting a plan that incorporated either golf or <br />residential or both was subsequently eliminated or set back by events that included <br />Pleasanton's developing a new municipal golf course at a different site, thus making a golf <br />course on the Bernal Property less important, the relatively low ranking given to golf in the <br />public's priorities for the Specific Plan site, and the approval of voter initiative Measure V <br />that prohibited construction of housing at the 318-acre City-owned portion of the Bernal <br />Property. With residential use rendered legally infeasible and golf rendered politically <br />infeasible, the key differences between the Phase I and Phase II plans were eliminated. In <br />effect, Alternative 3 melded into the project and, therefore, it is not relevant to the <br />discussion in this chapter. <br /> <br />b. Alternative 4: No Development <br /> <br />This alternative reflects the 318-acre project site as it currently is, without development. This <br />alternative serves as the starting point for the environmental review. <br /> <br />c. Alternative Uses for the Site <br /> <br />Pleasanton has been committed, since the approval of the Bernal Property Initiative <br />(Measure V) in November 2002, to the use of the site for public purposes. The initiative <br />reads: <br /> <br />"There shall be no transfer (with or without consideration), sale, or trade of any <br />City of Pleasanton-owned land within the boundaries of this Specific Plan ('City- <br />owned land'). All land uses on or of City-owned land within the Specific plan <br />boundaries must be accessible by and to the public. Housing of any type is <br />prohibited on City-owned land within the Specific Plan boundaries." <br /> <br />Within the framework established under Measure V, a variety of public and quasi-public uses <br />is possible, but uses not accessible to the public are not permitted. The Specific Plan <br />process has honored the direction of Measure V in the range and character of uses it has <br />considered and the array that it would allow (as described in Appendix B). The extensive <br />and scrupulous consideration that decision makers and the public have given to land use <br />choices for the site obviates the need for expansion of the array of potential uses <br /> <br />d. Alternative Project Site <br /> <br />A different type of alternative would be the selection of a different site. As noted in the box <br />on p. 162, the CEQA Guidelines indicate that a different location may be a suitable <br />alternative for consideration in an EI R. <br /> <br />In this particular case, an alternative site does not represent a feasible alternative. Pleasan- <br />ton acquired the site for the general public purposes currently proposed by the Specific Plan. <br />The Specific Plan has been formulated in response to the unique location and characteristics <br />of this property. Some of the uses proposed are not appropriate to any other site (e.g., the <br /> <br />165 <br />