Laserfiche WebLink
<br />A 14 [continuation) <br />Other project design features would help prevent light spill in the direction of 1-680: <br /> <br />. Lighting would be directed onsite and downward (away from the freeway); <br /> <br />. Lighting fixtures would be shielded to prevent light spill; and <br /> <br />. Landscaping including numerous canopy trees would be planted within the area <br />located between the freeway and the sports field lighting, <br /> <br />A 15 Comment: <br />Commissioner Fox asked for a more precise definition of a "stadium" with respect to <br />projected seating capacity, <br /> <br />Response: <br />See Response 2, <br /> <br />A 16 Comment: <br />Commissioner Fox expressed concern about the noise level when the amphitheatre <br />and/or the sports fields operate with a capacity crowd, How does that noise level <br />relate to the standards in the Noise Element of the General Plan~ <br /> <br />Response: <br />The EIR noise consultants considered the noise generation potential of the various sports <br />fields and the amphitheatre, These noise levels were evaluated in the context of <br />surrounding uses, recognizing that site planning and design features of the Specific Plan <br />and the Bernal Community Park Master Plan provide for attenuation of noise, <br /> <br />For the proposed sports fields, noise attenuation measures built into the project include <br />the following: <br /> <br />. Sports fields lighting is expected to end by 10:00 PM, <br /> <br />. Sports fields are proposed to be located 800 feet or farther from the nearest residences <br />to the west, which would attenuate noise, <br /> <br />. Acoustical shielding would be provided by earth berms (minimum five feet in height) <br />proposed to run the length of the Grand Meadow, <br /> <br />. Amplified sound for announcing games would be directed downward toward the <br />viewing terraces and play areas only, <br /> <br />. With respect to the football/lacrosse field, which is proposed to be located along the <br />Union Pacific Railroad and farther to the south than the other sports fields, the 500 <br />feet of distance between the field and the closest residences to the south would <br />attenuate noise levels such that, while maximum noise levels could occasionally be <br />audible, no significant increase would be expected in hourly average or daily average <br />noise levels at those residential locations, <br /> <br />For the potential amphitheatre, noise attenuation measures built into the project include <br />the following: <br /> <br />. The amphitheatre would be located more than 1,200 feet from the nearest residences <br />to th e west. <br /> <br />. The five-foot (minimum) earth berms proposed to run the length of the Grand <br />Meadow would provide acoustical shielding, <br /> <br />. The amphitheatre is envisioned as a bowl arrangement with the stage facing to the <br />southeast, <br /> <br />14 <br />