Laserfiche WebLink
<br />consultant team (including Balance Hydrologic and L TD Engineering) to review and <br />integrate storm water runoff from Bernal Avenue and the Fairgrounds, One of the <br />tasks in that professional services contract includes the redesign of the Bernal <br />Avenue ditch as well as the existing ditch crossing the north east portion of the <br />Bernal Property, This is an example of one of the flows that pass through the devel- <br />opment directly into the B2 channel, bypassing the detention ponds, <br /> <br />C 20 Comment: <br />Currently the drainage ditch along the south side of Bernal Avenue and Drainage <br />Channel B-2-1 are inadequate to handle existing storm waters, <br /> <br />Response: <br />See Response C19, <br /> <br />C 21 Comment: <br />The flood control improvements to the drainage ditches identified in Comment C19, <br />designed by Zone 7 in the 1960s as part of an approved public bond, have not yet <br />been constructed, Consequently, flooding historically occurs on the Bernal Property <br />and backs up onto the Fairgrounds, <br /> <br />Response: <br />See Response C19, <br /> <br />C 22 Comment: <br />The DEIR and the Phase II Specific Plan inadequately address how the project will <br />handle storm water that historically drains from upstream, <br /> <br />Response: <br />See Response C19, <br /> <br />C 23 Comment: <br />While the Phase II Specific Plan includes a map for water (Figure 6-1) and a map for <br />sewer (Figure 6-2), it does not include a map for storm water, <br /> <br />Response: <br />Figure 13 (p, 57) in the DEIR shows the location of the storm water detention basins, <br /> <br />C 24 Comment: <br />While detention basins are proposed to be located on the southwest portion of the <br />project, the DEIR does not clearly address how peak flow storm water from the north- <br />east portion of the project will reach these detention basins, <br /> <br />Response: <br />See Response A6a, <br /> <br />C 25 Comment: <br />It is envisioned that amplified sound will be allowed at the project's proposed 1,000- <br />seat outdoor theatre, The DEI R does not address how such sound might impact <br />concerts, events, or activities at the Fairgrounds, <br /> <br />23 <br />