Laserfiche WebLink
<br />their presence on the site, The only reference made to an actual field survey is one <br />that took place approximately 20 years ago (from 1986) as indicated on page 59, <br /> <br />Response: <br />See Responses to Comments J3 and j4 below, <br /> <br />E 14 Comment: <br />Assessment of Noise Impacts for Alternative 2 (page 176, item j), The discussion of <br />noise impacts to sensitive receptors, i,e, Hearst Elementary School, implies that <br />trains idling at the station would cause additional noise impacts, Trains idling at the <br />station mayor may not contribute additional noise while idling at the station - <br />depending on the orientation of the station (the station could be situated on the site <br />so as to block noise in the direction of the school), and the orientation and <br />placement of additional mitigation measures that could be considered, including <br />sound walls, earth berms, etc, <br /> <br />Response: <br />Comment noted, <br /> <br />E 15 Comment: <br />Noise impacts from the proposed outdoor theater on other activities within the <br />development were not adequately addressed, <br /> <br />Response: <br />See Response A 16, <br /> <br />E 16 Comment: <br />It is the responsibility of the applicant to comply with Federal, State, and local water <br />quality standards and regulations, Water quality protection must be implemented <br />both during construction and after construction, <br /> <br />Response: <br />The commenter indicates that it is the responsibility of the applicant to comply with <br />water quality standards and regulations, The applicant would be required by the City <br />of Pleasanton (in compliance with the Countywide NPDES permit) to implement <br />control measures and Best Management Practices (BMPs) designed to minimize <br />impacts to surface water quality, These issues are addressed in the Hydrology and <br />Water Quality section of the DEI R, <br /> <br />31 <br />