My WebLink
|
Help
|
About
|
Sign Out
RES 06035
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
2000-2009
>
2006
>
RES 06035
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2006 4:17:08 PM
Creation date
6/7/2006 4:02:28 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
5/16/2006
DOCUMENT NO
RES 06035
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
377
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Draft Environmental Impact Report <br />Bernal Property Phase II Specific Plan <br /> <br />. Assure the protection of cultural resources previously or newly identified by under- <br />taking the following actions: <br /> <br />(1) Provide for preservation via "capping"15 and <br /> <br />(2) (If known sites cannot be avoided:) <br /> <br />(a) Develop and implement a Resources Recovery Plan16 at known sites; <br /> <br />(b) Implement cultural resources protection measures consistent with the <br />Resources Recovery Plan during all stages of site preparation and construction <br />activity; and <br /> <br />(c) Document any archaeological findings at the site in a report meeting profes- <br />sional standards and filing the report with appropriate state and city offices, <br /> <br />With implementation of these cultural resource protection measures as set forth in the <br />Specific Plan, the potential of the Specific Plan to result in adverse impacts on cultural <br />resources is considered to be less than significant. <br /> <br />d. Mitigation Measures <br /> <br />No significant effects on cultural resources have been identified; therefore, no mitigation <br />measures are needed, <br /> <br /> <br />1. Framework for Analysis <br /> <br />This section assesses the geology, soils, and seismicity environment ofthe proposed project <br />based on the inspection of current site conditions, published and unpublished geologic <br />reports, and topographic and fault maps. This section also assesses potential impacts from <br />seismic shaking and adverse soil conditions that could result from implementation of the <br />Phase II Specific Plan, <br /> <br />2. Setting <br /> <br />The setting of the Plan Area was described in the 1997/2000 Phase I Specific Plan EI Rand <br />that setting discussion covered all the Phase II area, In summary, the project area is located <br /> <br />, 5 "Capping" is an approach that constitutes avoidance of potential archaeological resource impacts if the site <br />for a particular use requires no soil disturbance for site preparation or if the existing ground surface is <br />overcovered by additional soil or paving prior to site development, such that no disturbance of the <br />underlying soils that could potentially affect cultural resources occurs. In the Phase II Specific Plan. <br />numerous sites/uses may be suitable for the application of avoidance or capping or some combination <br />thereof, particularly the areas proposed for parks, open space, and/or parking. <br />'6 A "Resources Recovery Plan" is a plan that is designed and implemented to gather a sufficient quantity and <br />diversity of data types at each site, and/or set aside a sufficient portion of each site for potential later <br />investigation, to consider the loss a less-than-significant impact. See detailed description in 1997/2000 EI R, <br />p,255, <br /> <br />72 <br />
The URL can be used to link to this page
Your browser does not support the video tag.