<br />Draft Environmental Impact Report <br />Bernal Property Phase II Specific Plan <br /> <br />The studies were not found by the DOHS to be definitive. Therefore, the Conditions of <br />Approval of Bernal Property Phase I development (Condition 38,(e))22 required the property <br />owner to undertake a process of expert studies and review by responsible health services <br />agencies to assess whether site conditions posed a potential threat to public health and <br />safety. If so, a remediation plan was to be prepared under the supervision of the Alameda <br />County Health Services Department, including a radiological study of the site undertaken in <br />consultation with the Radiologic Health Branch of DOHS, The same condition would be <br />applicable to the Phase II Specific Plan, <br /> <br />c. Wildfire Fire Protection and Emergency Evacuation <br /> <br />The Phase I Specific Plan called for relocation of Fire Station #4 to the Specific Plan site; the <br />site designated was the site having the best potential of those considered to respond to <br />emergencies in less than five minutes, The fire station was constructed and began <br />operations in 2005, <br /> <br />The 1997/2000 EIR did not identifY or imply potential impacts from the proposed project <br />regarding potential impairment or physical interference with an adopted emergency <br />response plan or emergency evacuation plan. <br /> <br />3. Key Project Characteristics, Impacts, and Mitigation Measures <br /> <br />a. Key Project Characteristics <br /> <br />The proposed project includes the following components/characteristics that relate to <br />hazardous materials transport, use, storage, and disposal that could result from project <br />implementation: <br /> <br />. The proposed project is not expected to include extensive use of hazardous <br />materials. Hazardous materials may be brought to the site during construction for <br />fueling construction vehicles or for proposed site improvements (e,g, paints, adhe- <br />sives, lubricants), These hazardous materials uses are expected to be similar to <br />those used in Phase I construction activities, <br /> <br />. Hazardous materials, including pesticides, herbicides, fungicides, insecticides, and <br />fertilizers, may be used following project implementation for maintenance of sports <br />fields, trails, or for other passive recreational facilities or landscaped open space <br />areas, Hazardous materials (e,g, fuels, lubricants) may also be used in equipment <br />used to maintain these areas, <br /> <br />. Hazardous materials may be encountered by workers and the general public in soil <br />and/or groundwater from past or current land uses with known hazardous materials <br />uses including agriculture and wastewater effluent disposal. <br /> <br />. No buildings or other structures that could potentially be painted with lead-based <br />paint or contain asbestos are known to exist within the project area, <br /> <br />22 Bernal Property Conditions of Approval, Adopted August 28, 2000, p, 20, <br /> <br />80 <br />