Laserfiche WebLink
<br />Task 8 - Design Support during Construction <br />CONSULTANT will be available to support the CITY during pre-bid and the <br />construction phase of the project. We will address questions during the pre-bid phase. <br />CONSULTANT will attend the pre-construction meeting and review contractor RFI's <br />and shop drawings during the construction of the project. CONSULTANT has budgeted <br />26 hours for this task as described in the fee estimate. <br /> <br />EXCLUDED SERVICES <br />Services excluded from this Scope of Services include, but are not limited to, the <br />following: <br />. Landscape and Irrigation Design <br />. Traffic Signal Design <br />. Potholing of existing utilities <br />. Utility relocation design <br />. location design <br />· Design of storm drain facilities other than curb and gutter <br /> <br />These services can be provided as additional services if the CITY desires. <br />