My WebLink
|
Help
|
About
|
Sign Out
SR 06:177
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2006
>
SR 06:177
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/13/2006 3:44:47 PM
Creation date
7/13/2006 3:42:12 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
7/18/2006
DESTRUCT DATE
15 Y
DOCUMENT NO
SR 06:177
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Task 8 - Design Support during Construction <br />CONSULTANT will be available to support the CITY during pre-bid and the <br />construction phase of the project. We will address questions during the pre-bid phase. <br />CONSULTANT will attend the pre-construction meeting and review contractor RFI's <br />and shop drawings during the construction of the project. CONSULTANT has budgeted <br />26 hours for this task as described in the fee estimate. <br /> <br />EXCLUDED SERVICES <br />Services excluded from this Scope of Services include, but are not limited to, the <br />following: <br />. Landscape and Irrigation Design <br />. Traffic Signal Design <br />. Potholing of existing utilities <br />. Utility relocation design <br />. location design <br />· Design of storm drain facilities other than curb and gutter <br /> <br />These services can be provided as additional services if the CITY desires. <br />
The URL can be used to link to this page
Your browser does not support the video tag.