My WebLink
|
Help
|
About
|
Sign Out
SR 06:177
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2006
>
SR 06:177
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/13/2006 3:44:47 PM
Creation date
7/13/2006 3:42:12 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
7/18/2006
DESTRUCT DATE
15 Y
DOCUMENT NO
SR 06:177
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Signing and ~arking Plan - Signing and marking plans will identify the work required <br />to install pavement markings and remove, relocate and install signs through the project <br />limits. The plans will layout the pavement markings based on the roadway centerline, and <br />will clearly identify any striping angle points. <br /> <br />Task 6.1 50% PS&E <br />Upon approval of the GAD, 50% plans, specifications and estimate will be prepared. <br />This package will include major elements of plan set, technical provisions and estimate. <br />Comments from this submittal will be incorporated into the 90% Plans. <br /> <br />Deliverable: five (5) sets of the 50% PS&E <br /> <br />Task 6.2 90% PS&E <br />Once review comments from the 50% have been received and resolved, the 90% plans <br />will be prepared and submitted for review. This design phase will include preparation of <br />cross sections and earthwork calculations and an itemized engineer's quantity estimate for <br />the construction of the roadway. <br /> <br />Comments from this submittal will be incorporated into the 100% Plans. <br /> <br />Deliverable: five (5) sets of the 90% PS&E, and the "red lined" set of plans with CITY <br />comments from the previous submittal. <br /> <br />Task 6.3 100% PS&E <br />After CITY review of the 90% plans, comments will be resolved and incorporated into <br />the 100% PS&E. <br /> <br />Deliverable: <br />. Ten (10) sets of the final PS&E, and the "red lined" set of plans with CITY <br />comments from the previous submittal. <br />. final plan sheets signed and plotted on Mylar. <br />. Electronic files ofPS&E <br /> <br />Task 7 - Utility Coordination <br />CONSULTANT will prepare a Utility Conflicts Map, showing the proposed roadway <br />geometrics superimposed on existing roadway base map (including both surface and sub- <br />surface utilities). Utility conflicts will be noted on the map. This map will be the basis <br />for discussion with the CITY regarding modifications to the roadway cross-section, in an <br />effort to avoid conflicts. In the event that some conflicts are unavoidable, <br />CONSULT ANT will assist the CITY in conducting a utility coordination meeting. <br />CONSULTANT shall prepare a utility log which will identify the affected utility <br />companies, track the status of utility contacts, including plan submittals, action items, etc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.