Laserfiche WebLink
<br />existing roundabout at the end of Thiessen Street, which was built at the time of the Neal School <br />road improvements were constructed and is a consideration for traffic safety of pedestrians, <br />bicyclists, and equestrians. The City is evaluating an initial study and mitigated Negative <br />Declaration providing mitigation measures that would summarily protect the drainageway. <br />However, this document needs to be routed to the State Clearinghouse and distributed to the CA <br />State Dept ofFish and Game. The review and public comment period will be complete prior to <br />the project going to the City Council for action. <br /> <br />Any other previously identified effects or impacts are mitigated to a level of insignificance, with <br />the mitigation measures incorporated into the project's design or imposed on the project <br />pursuant to the conditions of approval. <br /> <br />IX. STAFF RECOMMENDATION <br /> <br />Staff recommends that the Commission take the following actions: <br /> <br />I. Find that the proposed PUD development plan is consistent with the General Plan and <br />Vineyard Avenue Corridor Specific Plan; <br /> <br />2. Make the PUD findings as listed in this staff report; and <br /> <br />3. Adopt a resolution recommending approval ofPUD-54, subject to the conditions of <br />approval listed on Exhibit B, and forward the PUD development plan to the City Council <br />for public hearing and review. <br /> <br />Staff Planner: Steve Otto, Associate Planner (phone: 931-5608 or email: sotto@ci.oleasanlon.ca.us) <br /> <br />Page - 22 <br />