Laserfiche WebLink
<br />situations. In this case, the developer was able to tailor the development standards and <br />guidelines to the unique situations presented by hillside terrain, the desire to preserve and <br />protect natural open space, and the desire to limit the amount and type of grading which <br />can occur with individual lots. Staff feels that the development standards and guidelines <br />as proposed and conditioned can accomplish such goals. <br /> <br />Staff feels that the proposed development plan takes into account the City's desire to <br />preserve open space and significant vegetation and to reduce grading on hillsides. The <br />developer is proposing to limit the size of the building envelopes and preclude <br />development in the remaining open space. The PUD process also allows for ample input <br />from the public and for an ultimate decision by the City Council regarding <br />appropriateness of the proposed use and development plan. <br /> <br />Stafffeels that through the PUD process the proposed project has provided the developer <br />and the City with a development plan that optimizes the use of this hillside site in a <br />sensitive manner. Therefore, staff believes that this finding can be made. <br /> <br />VII. CONCLUSION <br /> <br />The subject site is sensitive due to its location on a hillside with many existing trees. Stafffee1s <br />that the proposed plan is appropriate in density and design for this site and conforms to the <br />Vineyard A venue Corridor Specific Plan. As conditioned, staff feels that the proposed <br />development plan and design guidelines address the types of issues and concerns that staff <br />normally has regarding hillside development. Therefore, staff is requesting that the Commission <br />recommend approval of the proposed development plan. <br /> <br />VIII. ENVIRONMENTAL ASSESSMENT <br /> <br />Environmental review for the proposed project was undertaken with the Final Environmental <br />Impact Report (EIR) approved by the City Council for the Vineyard Avenue Corridor Specific <br />Plan in conformance with the standards of the California Environmental Quality Act (CEQA). <br />There are no substantial changes to the project or to the circumstances under which the project is <br />being undertaken that involve new significant environmental effects or that substantially <br />increase the severity of previously identified effects. <br /> <br />However, the proposed access road alignment has been modified by moving the entry from the <br />existing road alignment of Lot 25 from the easterly boundary to the westerly boundary. It was <br />relocated 50 feet from the centerline of the drainage swa1e located on Lot 26, Lands of <br />Brozosky. Staff has since discovered that the V ACSP and the EIR restrict construction from <br />occurring within 100 feet of the centerline of Jurisdictional Waters of the U.S. of which this <br />ephemeral drainageway is. The lots have been revised to stay out of this setback area, however, <br />staff proposes supporting the location in the road in that the access road will align with the <br /> <br />Page - 21 <br />