Laserfiche WebLink
<br />construction be conducted outside the bird-breeding season (February through August). In an <br />event that the construction cannot be scheduled outside the breeding season, a wildlife biologist <br />should conduct a breeding bird survey within 30 days of the onset of construction to determine if <br />nesting birds are present. In the event that nesting birds are identified to be present, further <br />mitigation may include establishing buffers no less than 50 feet from active nests until young <br />birds have fledged the nest. Staff has added condition to address these issues. <br /> <br />During the site assessment period, Congdon's tarplant (Hermizonia parryi ssp. Congdonii) was <br />found at a fcw scattered locations within and adjacent to the proposed construction area. <br />Although not a state or federal listed species, Congdon tarplant is afforded a special status listing <br />by CNPS. To minimize the impact to this plant, the report recommends that seed collection and <br />seed storage until it is time to reseed. Staff has included a condition to address this issue. <br /> <br />Access/Circulation and Traffic <br /> <br />Access to the proposed development would be from a private drive off of Dublin Canyon Road. <br />The private court has a hammerhead design to accommodate fire truck maneuvering. The <br />applicant is required to pay for the pro rata sharc of improvement on Dublin Canyon Road. <br /> <br />The City's Traffic Engineer has reviewed the proposed three-lot development. Based on the <br />amount of traffic that may be generated from the proposed development, the City Traffic <br />Engineer requires the applicant pay for the required traffic mitigation fee. No traffic report is <br />required. <br /> <br />Noise Study <br /> <br />At the request of staff, a noise study was performed by Thorburn Associates over a 24-hour <br />period. The report found the sources of noise impacting the subject site are from Interstate 580, <br />BART, and daily traffic on Dublin Canyon Road and Laurel Creek Drive. The report finds that <br />the outdoor noise at the proposed residential house sites would be conditionally acceptable (per <br />General Plan) at 63-67 dBA Ldn, and that the indoor noise at the site would be at 45 Ldn, a <br />normally acceptable category. <br /> <br />The report further finds that the exterior noise would be reduced due to the proposed <br />construction measures. Stucco finish over plywood sheathing, and insulation in the wall cavity <br />would improve the noise impact. Additionally, window glazing and weather-stripping at doors <br />would also help reducc thc noise Icvel. The report concludcd that the proposed construction at <br />the proposed lots would conform to the Gencral Plan. <br /> <br />Case No. PUD-44 <br /> <br />Planning Commission <br /> <br />Page - 8- <br />