My WebLink
|
Help
|
About
|
Sign Out
SR 06:182
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2006
>
SR 06:182
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/28/2006 4:49:46 PM
Creation date
9/14/2006 4:55:19 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
10/3/2006
DESTRUCT DATE
15 Y
DOCUMENT NO
SR 06:182
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
199
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. The public sidewalk on Cameron Avenue must be rural-looking, constructed of material <br />other than concrete that will accommodate pedestrians with wagons and strollers; <br />· No traffic circles and/or roundabouts on Cameron Avenue; <br />· Look into provided a three-way stop sign at the Cameron Avenue/Martin Avenue inter- <br />section; <br />. Maintain Cameron Avenue at a 28-foot width; <br />. Extend Street "A" to Martin Avenue; <br />. Explore a curved alignment for Cameron Avenue; and, <br />. Return the proposal to another work session. <br /> <br />May 10th Planning Commission Work Session <br /> <br />The staff report and minutes of the Planning Commission work session meeting are attached. A <br />revised project was presented to the Planning Commission - reduced density, reduced building <br />floor areas by 200 to 400 square feet, and a revised design for one building model - with four <br />alignment options for Cameron Avenue, including a public sidewalk, and a discussion covering <br />the feasibility of extending Street "A" to Martin Avenue. Ms. Pam Hardy, Ponderosa Homes, <br />was present to speak in favor of the project and to answer questions. Homeowners speaking on <br />the proposal included Matt Lawer, Steve Grimes, Shirley Lauer, Greg Jetter, Kelly Cousins, <br />Gregory Ketell, Natalie Herb, and Edward Reedy. <br /> <br />The Planning Commission directed staff and the applicants to: <br /> <br />· Reconstruct Cameron Avenue following the applicant's Option Four with a separated <br />sidewalk following the staff-prepared sketch; <br />· No pedestrian pathway or public street connection through the Selway property to Martin <br />Avenue; <br />. Investigate the feasibility of a traffic barrier on Cameron A venue at the westerly project <br />boundary; <br />· Discuss the feasibility of under grounding the overhead lines on Trenery Drive and Martin <br />Avenue; and, <br />. Return the proposal to a public hearing. <br /> <br />IV. PROJECT DESCRIPTION <br /> <br />The proposal includes the following: <br /> <br />Proposed Site Design <br /> <br />. Twenty-five production lots for Ponderosa Homes. The lots will vary in size from 20,786 <br />square feet (0.48-acres) for Lot 13 to 35,755 square feet (0.82-acres) for Lot 24. Lot 2 <br />facing Trenery Drive will be 41,266 square feet (0.95-acres) in area. <br /> <br />Item 6.e., PUD-50 <br /> <br />Page 90f29 <br /> <br />June 28, 2006 <br />
The URL can be used to link to this page
Your browser does not support the video tag.