Laserfiche WebLink
<br />centerline, which exceeds the City's design goal of a 128-foot centerline-to-centerline separa- <br />tion. <br /> <br />Some neighbors believe that the loop street's intersections with Cameron Drive should be <br />changed, with the west "leg" moved closer to the west project boundary towards the rear prop- <br />erty lines of the Palmer Drive properties and the east "leg" relocated to directly access Martin <br />A venue between the Selway, Lai, and Blaine properties. At the second Planning Commission <br />work session, staff stated its reasons for not supporting a direct connection to Martin Avenue: <br /> <br />. It may not reduce traffic impacts to Cameron A venue. Measured from the 900 curve of <br />Street "A", the connection to Martin Avenue will be approximately 480 feet long, equal <br />to the 480-foot distance from the 900 curve to Cameron Avenue. Although equal in dis- <br />tance, staff believes that the future residents of this development would still use the Cam- <br />eron Avenue connection for Street "A" as the shortest route from their homes to Mohr <br />Avenue. If Lots 16 and 21 were to be terminated with a cul-de-sac or turn-around but <br />remain connected to Cameron Avenue, the net effect will still be 24 lots using Cameron <br />Avenue. <br /> <br />. It will place a public street behind the Lai and Blain properties making these properties <br />double frontage lots. If the Street "A" connection to Martin Avenue were to become <br />heavily used by project traffic and neighborhood traffic, the rear yards ofthese properties <br />and the Selway property would be subjected to traffic noise. (The Blain property would <br />be impacted by traffic noise from Street "A", Diablo Court, and Martin Avenue.) Termi- <br />nating the east leg of Street "A" with a cul-de-sac or turn-around may also create double- <br />frontage lots within the proposed development. The City has avoided double-frontage <br />lots within new developments and between proposed/existing developments. <br /> <br />. The direct connection from Cameron Avenue to Martin Avenue may become a "cut- <br />through-traffic" route for parents dropping off/picking up their children at Mohr Elemen- <br />tary School. <br /> <br />The 24 lots of this development using Cameron Avenue will generate approximately 240 trips <br />per day and 24 trips during the a.m.lp.m. peak hours. As stated in the "Traffic Section" of this <br />staff report, the project traffic anticipated to be added to Cameron Avenue will not cause it to <br />exceed its present LOS "c" condition. Therefore, staff considers there to be adequate street ca- <br />pacity on Cameron Avenue to handle the project's traffic. <br /> <br />Staff does not dismiss the neighbors' concerns/comments pertaining to the traffic issues on <br />Cameron Avenue, including the high vehicle speeds observed during the a.m.lp.m. peak hours. <br />The applicant has addressed Cameron Avenue traffic calming by reconstructing Cameron A ve- <br />nue with a curvilinear alignment. Additional traffic calming measures can be handled on an on- <br />going basis by the City at any time. <br /> <br />Item 6,e.. PUD-50 <br /> <br />Page 18 of29 <br /> <br />June 28, 2006 <br />