My WebLink
|
Help
|
About
|
Sign Out
SR 06:242
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2006
>
SR 06:242
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/12/2006 2:05:17 PM
Creation date
10/12/2006 1:09:35 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
10/17/2006
DESTRUCT DATE
15 Y
DOCUMENT NO
SR 06:242
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
348
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Urban Stormwater Runoff <br /> <br />The applicant will install a bio-retention pond - approximately 20,000 square feet in area - on <br />the east side of Lot 1 with the first construction phase to pretreat the development's storm water <br />runoff before entering the City's storm system. The bio-retention pond is required to be main- <br />tained by the development's homeowners association. <br /> <br />Stormwater runoff from the public street and all lots will be conveyed to the bio-retention pond <br />by "V"-ditch and by underground piping. The applicant's proposal is reflected on the develop- <br />ment plan and in the draft conditions of approval. The development's storm water runoff meas- <br />ures will be shown in detail with the tentative subdivision map for review and approval by the <br />Planning Commission. <br /> <br />The project will be required through the grading and building permit and construction processes <br />to incorporate best management practices to control erosion and to prevent discharges into the <br />City's storm drain system resulting from this development. <br /> <br />Regional Water Ouality Control Board <br /> <br />Regional Water Quality Control Board (RWQCB) staff met with City staff and the applicant on <br />the site to discuss the project's grading, existing swales/seeps, urban stormwater runoff mitiga- <br />tion measures, etc. R WQCB staff considered the overall proposal - grading, treatment of <br />swales/seeps, bio-retention areas, etc. - to be sensitive to the site with its impacts reduced to a <br />less-than-significant -level. <br /> <br />The only issue identified by the RWQCB staff requiring further analysis and potential mitigation <br />is the 20 linear feet offill proposed at the end of the southernmost swale/seep before it enters the <br />culvert on the west side of Foothill Road. However, RWQCB staff believes that this fill may be <br />mitigated by the proposed planting of native trees and habitat planting along the three swales/ <br />seeps - totaling approximately 700 linear feet, a 35 to 1 mitigation ratio - shown in the land- <br />scape design guidelines. Another potential mitigation measure would be to bypass this area with <br />underground piping, thereby avoiding the proposed fill this area. <br /> <br />Since this issue is isolated to a relatively small, 20-foot section of the existing swale/seep, staff <br />believes that this issue can be resolved by the applicant, City staff, and the RWQCB staff at the <br />tentative subdivision map for review by the Planning Commission. Staffs recommendation is <br />reflected as a draft condition of approval. Based upon the on-site meeting and discussion, the <br />RWQCB staff indicated their comfort with the project going forward to the Planning Commis- <br />sion. <br /> <br />View Analyses <br /> <br />View analyses on discs are attached showing the before/after views of the project from various <br />vantage points. The view analyses include: <br /> <br />Item 6.c., PUD-58 and PGPA-ll <br /> <br />Page 26 of 34 <br /> <br />August 23. 2006 <br />
The URL can be used to link to this page
Your browser does not support the video tag.