My WebLink
|
Help
|
About
|
Sign Out
SR 06:242
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2006
>
SR 06:242
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/12/2006 2:05:17 PM
Creation date
10/12/2006 1:09:35 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
10/17/2006
DESTRUCT DATE
15 Y
DOCUMENT NO
SR 06:242
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
348
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Any discharge of dredged or fill material into waters of the United States must be approved by <br />the United States Army Corps of Engineers pursuant to Section 404 of the Clean Water Act. Two <br />permit types are possible: <br /> <br />I) Individual Permits; or <br /> <br />2) Nationwide Permits, which cover specific categories of activities, Nationwide Permits are <br />generally less time-consuming than the Individual Permit. Nationwide Permits may be <br />grouped together or "stacked with certain limitations." A detailed discussion is provided <br />for both permit types. <br /> <br />United States Armv Corps of Engineers Individual Permits <br /> <br />Generally, for residential, commercial and institutional development projects, the following <br />conditions require a standard Individual Permit from the United States Army Corps of Engineers: <br /> <br />. Discharges resulting in the fill of any tidal waters or wetlands <br /> <br />. Impacts to more than one-half acre of non-tidal waters or wetlands <br /> <br />. Impacts to greater than 300 linear feet of non-tidal waters or wetlands, includes creeks <br />(either perennial intermittent or ephmeheral), an-oyos or vegetated and un vegetated <br />tributaries <br /> <br />Individual Permits require the submission of a comprehensive project application and <br />compliance with the United States Army Corps of Engineers' formal review process because it is <br />a discretionary permit. Individual Permit applications require analyses of direct, indirect, and <br />cumulative impacts; special-status species surveys; an analysis of both on-site and off-site <br />project alternatives; an economic analysis of each on-site alternative and efforts showing <br />avoidance and minimization of impacts to wetlands and biological resources; a United States <br />Army Corps of Engineers verified wetland delineation; and other project-specific materials. <br />Mitigation for unavoidable impacts cannot be considered by the United States Army Corps of <br />Engineers during their evaluation of the application, However, applicants generally include the <br />proposed mitigation in the application, as the other permitting agencies will consider mitigation <br />during their evaluation of the application. The formal apphcation review provides opportunities <br />for public notice and comment, requires the preparation of an alternatives analysis pursuant to <br />the Environmental Protection Agency Section 404 (b)(1) and requires compliance with the <br />NEPA environmental review process. The granting of an Individual Permit is a discretionary <br />action and the processing time largely depends on the level of impacts. The average time <br />necessary for the United States Army Corps of Engineers to process an Individual Permit is six <br />to nine months, although controversial projects can take up to two years or more. Lastly, the <br />United States Army Corps of Engineers has the ability to waive the 300 linear feet of stream <br />requirement that triggers an Individual Permit if the conditions warrant this waiver. In the case of <br />a waiver, an applicant with a projcct affecting more than 300 linear feet of stream bank can <br />rp{llIP<;,;:t thp I fnitprl "t~tp~ Arm" {""nrrH' .-..fC....r;.....n."".." t", ~11~.., tl..~.. ~ lI.l.." . In', Tl <br />waiver does not negate the requirement for a permit, but allows the applicant to use the <br />Nationwide Pcrmit system already in place. <br /> <br />Sycamore Associates LLC -- Regulatory Pemlitting Implications 05/06/04 <br /> <br />6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.