My WebLink
|
Help
|
About
|
Sign Out
SR 06:287
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2006
>
SR 06:287
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/3/2007 4:25:02 PM
Creation date
12/13/2006 3:40:51 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
12/19/2006
DESTRUCT DATE
15 Y
DOCUMENT NO
SR 06:287
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Ruby Hill Event Center <br />PUD-93-02-08M <br /> <br />Therefore, this would be a less-than-significant-impact. <br /> <br />c-d) There are no known archaeological or historical sites identified on the subject site. There <br />could be previously undiscovered subsurface resources present. Should subsurface <br />resources be found upon excavation, all work will be required to be halted whereby the <br />City shall be immediately notified. Necessary measures, such as consulting an <br />archaeologist, would take in place prior to construction resuming. This requirement <br />would be made as a condition ofthe project approval. Therefore, this would be a less- <br />than-signifIcant-impact. <br /> <br />d) If human remains are discovered during grading trenching or other on-site excavation, the <br />City requires the applicant to: <br /> <br />. Hire a qualified archaeologist to be present on site during the grading and <br />trenching for the foundation(s) and utility services in order to determine if any <br />bone, shell, or artifacts are uncovered. Work on the site will cease immediately. <br />The archaeologist and the Native American Heritage Commission and or their <br />representative shall be consulted to develop, if necessary, further mitigation <br />measures to reduce any archaeological impact to a 1ess-than-significant level <br />before construction continues. The applicant shall have the archaeologist produce <br />a letter stating that they were on site during the initial construction activities and <br />the result of their observations at the site. This requirement would be made as a <br />condition of the project approval. <br /> <br />. Prior to the issuance of any building permit, the applicant shall present a contract <br />or letter indicating the archaeologist who will be on site during the initial <br />construction activities. <br /> <br />Therefore, this would be a less-than-significant-impact. <br /> <br />6. GEOLOGY AND SOILS <br /> <br />Environmental Setting <br /> <br />The approval of a project by a city or county must be in accordance with policies and criteria <br />established by the State Mining and Geology Board. Cities and counties shall require, prior to <br />the approval of a project, a geologic report defining and delineating any hazard of surface fault <br />rupture. If the city or county finds that no undue hazard of that kind exists, the geologic report <br />on the hazard may be waived, with the approval of the State Geologist. After a report has been <br />approved or a waiver granted, subsequent geologic reports shall not be required, provided that <br />new geologic data warranting further investigations is not recorded. <br /> <br />15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.