Laserfiche WebLink
<br />Ruby Hill Event Center <br />PUD-93-02-08M <br /> <br />Standards of Significance <br /> <br />For purposes of this environmental document, an impact is considered significant ifthe proposed <br />project would: <br />. Result in a project being built that will either introduce geologic, soils, or seismic hazard <br />by allowing the construction of the project on such a site without protection against those <br />hazards. <br /> <br /> Less Than <br /> Potentially Significant Less Than <br /> Significant With Mitigation Significant No <br />Issues Impact Incorporated Impact Impact <br />Geolol!V and Soils <br />Would the project: <br />a) Expose people or structures to potential <br /> substantial adverse effects, including the risk of <br /> loss, injury, or death involving: <br /> i) Rupture of a known earthquake fault, as D D [E] D <br /> delineated on the most recent Alquist-Priolo <br /> Earthquake Fault Zoning Map3 issued by the <br /> State Geologist for the area or based on other <br /> substantial evidence of a known fault? Refer <br /> to Division of Mines and Geology Special <br /> Publication 42. <br /> ii) Strong seismic ground shaking? D D ~ D <br /> iii) Seismic-related ground failure, including D D ~ D <br /> liquefaction? <br /> iv) Landslides? D D D ~ <br />b) Result in substantial soil erosion or the loss of D D ~ D <br /> topsoil? <br />c) Be located on a geologic unit or soil that is D D ~ D <br /> unstable, or that would become unstable as a <br /> 16 <br />