Laserfiche WebLink
<br />Ruby Hill Event Center <br />PUD-93-02-08M <br /> <br />i) Expose people or structures to a significant risk of <br />loss, injury or death involving flooding, <br />including flooding as a result of the failure of a <br />levee or dam? <br /> <br /> <br />j) Inundation by seiche, tsunami, or mudflow? <br /> <br />D <br /> <br />D <br /> <br />D <br /> <br />~ <br /> <br />Discussion <br /> <br />a,e,f) The proposed development will be required through the building permit and construction <br />process to incorporate best management practices for discharges resulting from this <br />development. The City has adopted the most recent Regional Water Quality Control <br />Board stormwater discharge requirements related to design, construction and <br />implementation of the subject site. A design feature incorporating the BMP's is the <br />provision ofbio-swales used as on-site treatment prior to discharge into the storm water <br />system. The applicant will be required to obtain the required permits and approvals from <br />SF Regional Water Quality Board. Therefore, this would be a less-than-significant- <br />impact. <br /> <br />b) The proposed development will not use ground water for this project. Any existing wells <br />will be required to be abandoned pursuant to the Alameda County Department of <br />Environmental Health. The development of this project does not anticipate a loss of <br />groundwater recharge potential. Therefore, this would be a less-than-significant-impact <br /> <br />c-d) Site development will alter the existing drainage pattern from its existing condition. The <br />channel will not be subject to substantial erosion or siltation. Therefore, this would be a <br />less-than-significant-impact <br /> <br />g-i) Structures will not be placed within a 100-year flood hazard. The proposed development <br />will not expose people or structures to a significant risk ofloss, injury or death involving <br />flooding. Therefore, this would be categorized as no-impact. <br /> <br />j) The City of Pleasant on is not at risk from seiche, tsunami, or mudflow. Therefore, this <br />would be categorized as no-impact. <br /> <br />9. LAND USE PLANNING <br /> <br />Environmental Setting <br /> <br />The project area is developed with a caretaker unit, several accessory buildings, and vineyards. <br />The project development is to construct an event center and preserve the existing vineyards. <br /> <br />22 <br />