Laserfiche WebLink
<br />Ruby Hill Event Center <br />PUD-93-02-08M <br /> <br />Department so as to provide access for emergency vehicles. Therefore, this would be a <br />less-than-signijicant-impact. <br /> <br />(f) On-site parking is part ofthe proposed development where adequate parking would be <br />available for event patrons as well as for the facility staff. Therefore, this would be a <br />less-than-signijicant-impact. <br /> <br />(g) The City's Traffic Engineer has reviewed the proposal. Based on the City's traffic <br />baseline report, and the past event schedule from a similar facility located to the north, <br />the proposed development would meet the City's policies and programs; therefore no <br />specific traffic study is required for this project. Therefore, this would be a no-impact. <br /> <br />16. UTILITIES AND SERVICE SYSTEMS <br /> <br />Environmental Setting <br /> <br />The City of Pleasant on has public services and infrastructure planned to meet the build out of the <br />General Plan, implemented by the Growth Management Plan. <br /> <br />Standards of Significance <br /> <br />For purposes of this environmental document, an impact is considered significant if the proposed <br />project would: <br /> <br />· Result in the construction of new water facilities or expansion of existing facilities; <br />· Result in exceeding the wastewater treatment requirements of the Regional Water Quality <br />Control Board; <br />· Result in or require the construction or expansion of existing wastewater treatment <br />facilities; <br />· Be served by a landfill that has inadequate pennitted capacity. <br /> <br />Issues <br /> <br />Potentially <br />Significant <br />Impact <br /> <br />Less Than <br />Significant <br />With Mitigation <br />Incorporated <br /> <br />Less Than <br />Significant <br />Impact <br /> <br />No <br />Impact <br /> <br />Utilities and Service Systems <br />Would the project: <br /> <br />a) Exceed wastewater treatment requirements of the 0 <br />applicable Regional Water Quality Control <br />Board? <br /> <br />o <br /> <br />~ <br /> <br />o <br /> <br />b) Require or result in the construction of new water 0 <br />or wastewater treatment facilities or expansion of <br />existing facilities, the construction of which <br />could cause significant environmental effects? <br /> <br />o <br /> <br />~ <br /> <br />o <br /> <br />32 <br />