Laserfiche WebLink
<br />located next to Stoneridge Drive instead ofthe neighbors. <br /> <br />15. Requested the building be moved closer to Stoneridge Drive. <br /> <br />16. Concerned with the building height and questioned ifit could be lowered. <br /> <br />17. Questioned the size and species of the proposed trees and whether they would be evergreen. <br />Requested that evergreen street trees be used along the Rheem Dr. frontage. <br /> <br />18. Questioned if the nursery children would be allowed to play outside. <br /> <br />19. Expressed concern with the future elementary school and its impacts. <br /> <br />20. Questioned when the church wanted to build the parish center and how long it would take to <br />construct. <br /> <br />21. Requested that construction vehicles be required to park on the church site. Requested that <br />construction staging area be located at the north end of the parking lot. Indicated a <br />preference for Monday through Friday construction hours versus Monday through Saturday. <br />Requested that the construction haul route use Stoneridge Drive, not Rheem Drive. <br />