Laserfiche WebLink
<br />Signage <br /> <br />Conceptual sign locations are shown on the proposed building elevations. <br /> <br />The development's sign program is important. Staff believes that the tenant signs should com- <br />pliment the developrnent's overall design character, be attractive, and be consistent with the de- <br />velopment's gateway location in addition to identifying the business tenants <br /> <br />^ sign program is conditioned to be subrnitted for review and approval prior to submitting plans <br />for a building permit. This is so there would be no conflict arising from signage mounting and <br />required structural components of the buildings. <br /> <br />Green Building Measures <br /> <br />The proposed project is required to rneet the City's Green Building Ordinance as follows: <br /> <br />· The Home Depot store exceeds 20,000 square feet and is required to achieve a "Certi- <br />fied" rating as defined by the U.S. Green Building Council's (USGBC), "Leadership in <br />Energy and Environmental Design (LEED)" 2.0 rating system for the design, construc- <br />tion, and operation of the proposed building. <br /> <br />· The Longs Drugs and Stores "A", "B", "C", and "Pad" buildings are individually less <br />than 20,000 square feet in t100r area and, therefore, are technically exernpt from the <br />Green Building Ordinance. However, a condition of approval encourages that all of the <br />buildings meet the Green Building Ordinance. <br /> <br />The green building measures for these buildings shall be shown on the building permit plan set <br />submitted for review and approval for review by the Planning Director before issuance of a <br />building perrnit. <br /> <br />Grading/Urban Stormwater Runoff <br /> <br />This is a t1at site, slightly elevated above the street grade at the corner of Stanley Boulevard and <br />Bernal A venue. Grading for the development will include mobilization, clearing and grubbing, <br />site grading, and trenching for on-site infrastructure leading to the construction of the building <br />and site improvements. The entire site would be graded at once. Short-term irnpacts are ex- <br />pected related to these activities. All construction equipment is required to conform to current <br />exhaust standards for ernission reductions to maintain compliance to NO, standards. To rniti- <br />gate short-term construction impacts, the applicant is required to provide the following dust con- <br />trol measures to reduce dust ernissions. <br /> <br />· Enclose, eover or water all soil piles minimally twice daily, or as otherwise deterrnined <br />by the City Engineer. <br /> <br />· Minimally water the site twice daily, or as otherwise directed by the Public Works In- <br />spection Staff. <br /> <br />PCUP-165/P DR-529/PMOD-81-25-7 M <br /> <br />Page 41 of48 <br /> <br />December 13, 2006 <br />