My WebLink
|
Help
|
About
|
Sign Out
12 Exhibits
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2007
>
022007
>
12 Exhibits
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2007 3:42:28 PM
Creation date
2/15/2007 3:32:05 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
2/20/2007
DESTRUCT DATE
15 Y
DOCUMENT NO
12 Exhibits
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
212
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Bb-231305 <br />the Auf der Maur Parcel. At the option of the Landowner, the <br />Bernal Avenue Extension may be financed by an acquisition assess- <br />ment district to be formed by the City. Also at the option of <br />the Landowner, the Bernal Avenue Extension may be constructed at <br />reduced width by eliminating the outside two lanes along its en- <br />tire length if a PUD application for the Shopping Center Parcel <br />has not been submitted to the City by the July 1, 1987 date. <br />Whether or not the Shopping Center Parcel develops, Landowner <br />agrees to dedicate the full right-of-way width required for the <br />ultimate planned Bernal Avenue in conjunction with the formation <br />of the Bernal Avenue Extension Assessment District. Pursuant to <br />its police power, the City may require construction of the <br />remaining lanes of Bernal Avenue if determined necessary in con- <br />junction with subsequent discretionary project approvals on the <br />Auf der Maur Parcel. <br /> <br />c. Temporary Storm Drain Easements. Landowner agrees <br />to grant rights of entry as necessary to construct storm drain <br />lines from the Valley Avenue Extension grade separation to the <br />Arroyo del Valle within the proposed right-of-way for the pro- <br />posed Bernal Avenue Extension. <br /> <br />d, Storm Drain Lines. The City will include in the <br /> <br /> <br />Valley Avenue Extension project a storm drain line within the <br /> <br /> <br />temporary storm drain easement described in Paragraph 4(c). The <br /> <br /> <br />storm drain line will be of sufficient size to accept anticipated <br /> <br /> <br />storm drainage from development of the Auf der Maur parcel. The <br /> <br /> <br />plans and specifications for the Project will call for unit pric- <br /> <br /> <br />ing of required manholes, storm drain laterals to catch basins <br /> <br />- 5 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.