Laserfiche WebLink
<br />Eh-231305 <br />and catch basins along Bernal Avenue. Storm drain laterals will <br /> <br />be of sufficient size to accommodate anticipated storm drain <br /> <br />flows from the street catch basins but need not be designed to <br />accommodate on site drainage from development of the Auf der Maur <br /> <br />parcel. Upon completion of the storm drain portion of the Proj- <br /> <br /> <br />ect, Landowner shall pay to City the amount by which the cost of <br /> <br />the Bernal Avenue manholes, laterals and catch basins exceeds <br /> <br />$25,000.00. <br /> <br />In conjunction with the construction <br /> <br />e. <br /> <br />Water Line. <br /> <br />of Bernal Avenue, Landowner will include a water line connection <br /> <br />from the water line in the existing Stanley Boulevard to the ex- <br /> <br />isting water I ine in Bernal Avenue at Del Valle Parkway. <br /> <br />This <br /> <br />line shall be of a size determined necessary by the Director of <br /> <br />Public Works for the City. However, the marginal cost of sizing <br />the water line larger than twelve inches shall be split equally <br /> <br />by City and Landowner. City shall make payment after the water <br /> <br />line has been installed upon receipt ()f an invoice with cost <br /> <br />verification. <br /> <br />, <br /> <br />5. Signalization. <br /> <br />a. Valley/Bernal and Stanley Boulevard Intersection. <br />In conjunction with the first discretionary project approval by <br /> <br />the City on the Auf der Maur Parcel, the developer would normally <br /> <br />be requested to participate in the cost of signalization of the <br /> <br />Valley/Bernal and Stanley Boulevard Intersection. To resolve the <br /> <br />timing and extent of the Landowner's participation in the cost of <br /> <br />that signal, the parties hereto agree that in conjunction with <br /> <br />- 6 - <br />