My WebLink
|
Help
|
About
|
Sign Out
16 ATTACHMENTS
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2007
>
030607
>
16 ATTACHMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/1/2007 8:45:53 AM
Creation date
2/28/2007 4:30:56 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
3/6/2007
DESTRUCT DATE
15 Y
DOCUMENT NO
16 Attachments
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
147
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Robin Giffin <br />From: Jeff Nespor <br />Sent: Wednesday, October 25, 2006 1.59 PM <br />To: Robin Giffin <br />Cc: <br />Subject: PUD-56 (Michael Aminian/Mohsen Sadri - 865 Clara Lane) <br />Robin, <br />I came in and spoke with you a few weeks ago, and said I'd follow up with an email. It <br />took a ~rrhile, nut here you qo. <br />As I mentlontd, we have no concerns about the project itself. Our ,oncern is mostly <br />regarding the construction of a city street across the northern portion of rn;r property, <br />replacing the one lane drve there now. I'd like to see specific details on the retaining <br />wall to be cunstru~-~ted, and assure that our drainage will be connected to the gutter/st_orm <br />drain system, not to mention the obvious fact that we'll need continued access to our home <br />during the construction of the road. <br />When the northern portion of our lot is graded to accommodate the new road, what will be <br />done in the way of landscaping or erosion control? <br />As a reminder to whom it may ^oncern, our water meter will :;eed to be moved when the road <br />work is done. Ple need to ausure that our service continues durir;q the road construction. <br />There is also conduit in place for telephone and cable servi~~e that needs t_o be retained, <br />or replaced, as well as gas service that exists beneath the futr,re roadway. <br />One thing I did not ask about when we spoke is the proposed streeY_ lights. Will the <br />fixtures match the ones installed in the Delco/Vineyard Hills development'? <br />And one final thing to note is the presence of a roundabout in Clara Lane Y_}:at will <br />certainly cruse difficulty during road construction and/or construction traffic for the <br />project itself. I am certain that the neia residents in the Deleo/Vineyard HiL1s pn~je~,t <br />would like to see some specific wording in any eventual approval about damarle dune to the <br />landscaping cr hardscaping of the roundabout. <br />That's all for new. Thanks for yrnir help. <br />Jeff and Colleen Nes~or <br />837 Clara Lane ~ ~ ~' <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.