Laserfiche WebLink
Therefore, staff concludes that the grading takes into account environmental characteristics <br />and is designed in keeping with the best engineering practices to avoid erosion, slides, or <br />flooding to have as minimal an effect upon the environment as possible. <br />5. Whether streets and buildings have been designed and located to complement the <br />natural terrain and landscape: <br />As conditioned, the proposed development of the site has been designed to be consistent with <br />the requirements of the Vineyard Avenue Corridor Specific Plan. The building pads are <br />generally graded flat; however, the areas around them have been designed to slope in a <br />manner similar to the existing contours. In addition, the extension of Clara Lane will be <br />designed to complement the natural terrain. <br />Therefore, staff feels that this PUD finding can be made. <br />6. Whether adequate public safety measures have been incorporated into the design of <br />the plan: <br />The project, as conditioned, will be consistent with City safety standards. As conditioned, <br />the homes will be equipped with automatic fire suppression systems (lire sprinklers). "I'he <br />project does include an emergency access driveway and "y"-hammerhead, as required by the <br />Vineyard Avenue Corridor Specific Plan. As conditioned, the applicants will be providing a <br />lire hydrant. The project will be required to comply with all building and fire code <br />requirements. <br />Therefore, staff believes that the plan has been designed and conditioned to incorporate <br />adequate public safety measures. <br />7. Whether the plan conforms to the purposes of the PUD District: <br />The proposed PUD development plan conforms to the purposes of the PUD district. One of <br />these purposes is to ensure that the desires of the developer and the community are <br />understood prior to the commencement of construction. Staff believes that the proposed <br />project implements the purposes of the PUD ordinance in this case by providing ahigh- <br />quality project consistent with the General Plan, Vineyard Avenue Corridor Specific Plan, <br />and Municipal Code. The PUD process allows for ample input from the public and for an <br />ultimate decision by the City Council regarding the appropriateness of the proposed uses and <br />development plan. <br />Therefore, staff believes that this finding can be made. <br />Case No. PUD-~6 <br />Planning Commission <br />Page - 16 - <br />