Laserfiche WebLink
Project No. JB-569 <br />20 June 2006 <br />Page 4 <br />4.2 Geotechnical Hazards <br />Risk of geotechnical hazards will always exist due to uncertainties of geologic <br />conditions and the unpredictability of seismic activity in the area. However, in our <br />opinion, based on available data, there are no indications of geotechnical hazards <br />that would preclude use of the site for the proposed development. The proposed <br />structures should be designed to meet current Uniform Bui/ding Code (UBC) <br />requirements to limit potential damage from ground shaking. <br />4.2.1 Liquefaction <br />It is our opinion, based on our review of hazard maps, the soil conditions <br />encountered, and laboratory testing, that the site soils encountered have a low <br />potential of soil liquefaction. <br />4.2.2 Landslides <br />Native slopes on the site are generally mild 13H:1 V or less). The fill slopes north <br />of the existing residence and in the northwest corner of the site appear to over- <br />steepened. These areas should be graded in accordance with our <br />recommendations. The slope immediately south of Lot 1 is the backyard for an <br />adjacent residence. The slope is mild (approximately 4H:1 V) and has a 10 to 1 5- <br />foot bench with a concrete drainage ditch at the property boundary. Based on <br />this information, it is our opinion that the site has a low potential for landslides. <br />Some minor sloughing may be expected as soils are saturated during the winter <br />months. <br />4.2.3 Flooding <br />The site is not located within the 100-year flood zone according to FEMA National <br />Flood Insurance Program Hazard maps (www. esri.com/hazards). <br />5.0 DISCUSSIONS <br />5.1 General <br />The recommendations contained in this report are based on the assumption that <br />the soil conditions encountered during construction are similar to those disclosed <br />by our exploration. If variations are noted during construction, Korbmacher <br />Engineering, Inc. should be notified so that we can supplement our <br />recommendations, as applicable. <br />Final grading plans were not available at the time of preparing this report. We <br />recommend the final grading plans be reviewed by our office prior to starting the <br />earthwork operations. <br />Korbmacher Engineering, Inc. <br />