Project No. JB-569 <br />20 June 2006 <br />Page 5 <br />According to the proposed grading plan, as shown on Figure 2, the Lot 1 building <br />pad will be near existing grade, the Lot 2 building pad will be cut and fill, and the <br />Lot 3 building pad will be fill material. We do not recommend that the footings <br />be founded partly on fill and partly on cut material. Therefore, to help reduce the <br />potential for differential settlement, the on-site soils should be over-excavated, <br />moisture-conditioned, and recompacted in the Lot 1 and Lot 2 foundation areas <br />as recommended in the earthwork section of this report. <br />Provided the earthwork recommendations are followed, it is our opinion that the <br />proposed residences may be supported on a conventional foundation system <br />established on compacted, engineered fill <br />Proper drainage must be provided to prevent moisture from penetrating beneath <br />foundations, concrete slabs-on-grade, and pavements. If moisture penetrates the <br />soils beneath these areas, there could be some movement and resulting <br />cracking/distress. Recommendations to help reduce the movement of the <br />foundations and concrete slab-on-grade floors/flatwork are discussed in later <br />sections of this report. <br />6.0 RECOMMENDATIONS <br />6.1 Earthwork <br />6.1.1 General <br />As previously stated, final grading plans were not available during preparation of <br />this report. We recommend that final grading plans be reviewed by our office <br />prior to starting the grading operations. <br />As previously discussed, the Lot 1 building pad will be near existing grade, the Lot <br />2 building pad will be cut and fill, and the Lot 3 building pad will be fill material. <br />We do not recommend that the foundations be founded partly on fill and partly <br />on cut material. To help reduce the potential for differential settlement, we <br />recommend the foundation subgrade soils for Lot 1 and the Lot 2 cut areas be <br />over-excavated a minimum of 2 feet below the proposed footing elevation for the <br />foundation areas, moisture-conditioned, and recompacted in the foundation area <br />and at least 5 feet beyond the structure and exterior flatwork/sidewalk areas in <br />plan view, if practicable. Deeper sub-excavation may be required depending on <br />soil conditions encountered during grading. Figure 8, Foundation Materials Under <br />Building, presents the details for over-excavating and replacing the soil with <br />compacted, engineered fill within the building limits. The existing undocumented <br />fill should be excavated and recompacted as shown in Figure 9, Typical Buttress <br />and Subdrain. Compaction recommendations are discussed in Section 6.1 .4 Fill <br />Placement and Compaction. <br />~Korbmacher Engineering, Inc. <br />