My WebLink
|
Help
|
About
|
Sign Out
16 ATTACHMENTS
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2007
>
030607
>
16 ATTACHMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/1/2007 8:45:53 AM
Creation date
2/28/2007 4:30:56 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
3/6/2007
DESTRUCT DATE
15 Y
DOCUMENT NO
16 Attachments
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
147
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project No. JB-569 <br />20 June 2006 <br />Page 13 <br />6.8 Plan Review <br />Before submitting design drawings and construction documents to the appropriate <br />local agency for approval, copies of the documents should be reviewed by our <br />firm to ensure that the recommendations in this report have been effectively <br />incorporated. <br />6.9 Construction Observations <br />We recommend that our representative be present during grading and foundation <br />excavation to observe that the work performed is in conformance with <br />specifications and recommendations provided here. We will also perform testing <br />as necessary to evaluate the quality of the materials and their relative compaction. <br />Records will be maintained of our site visits and test results. <br />At the completion of site grading and foundation excavation, we will submit a <br />summary of our observation and test results along with any necessary <br />supplemental recommendations. To assure that our personnel are at the site <br />when needed, we require that you notify us at least 2 working days before the <br />task begins. <br />7.0 LIMITATIONS <br />This report has been prepared for the exclusive use of the Client and the Client's <br />consultants for specific application to the proposed development. If changes <br />occur in the nature, design location, or configuration of the proposed <br />development, the conclusions and recommendations contained here shall not be <br />considered valid. Changes must be reviewed by our firm. <br />The analysis, opinions, conclusions and recommendations submitted in this report <br />are based in part on the referenced materials, site visit and evaluation, and <br />subsurface exploration. The nature and extent of variation among exploratory <br />borings may not become evident until construction. If variations appear, it will <br />be necessary to re-evaluate or revise recommendations made in this report. <br />The recommendations in this report are contingent on conducting an adequate <br />testing and observation program during construction of the proposed <br />development. Unless the construction observation and testing program is <br />provided by or coordinated with our firm, Korbmacher Engineering, Inc. will not <br />be held responsible for compliance with design recommendations presented in this <br />report and other supplemental reports submitted as part of this report. <br />Our services have been provided in accordance with generally accepted <br />geotechnical engineering practices. No warranties are made, express or implied, <br />Korbmacher Engineering, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.