My WebLink
|
Help
|
About
|
Sign Out
16 ATTACHMENTS
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2007
>
030607
>
16 ATTACHMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/1/2007 8:45:53 AM
Creation date
2/28/2007 4:30:56 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
3/6/2007
DESTRUCT DATE
15 Y
DOCUMENT NO
16 Attachments
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
147
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-roject No. JB-569 <br />20 June 2006 <br />Page 12 <br />We recommend reinforcing the concrete slab-on-grade floors with a minimum of <br />either, (1) No. 3 reinforcing bars spaced at 24 inches on center, or (2) with an <br />alternate steel reinforcement as required by the project structural engineer. In <br />general, the steel reinforcement should be supported by concrete dobies to <br />maintain the minimum requirement for clearance according to the latest UBC <br />standard. The project structural engineer should determine the acceptable <br />concrete cover. Crack control joints should be located as directed by the project <br />structural engineer. <br />Recommendations presented in the American Concrete Institute manual should be <br />complied with for all concrete placement and curing operations. Improper curing <br />techniques and/or excessive slump (water-cement ratio) could cause excessive <br />shrinkage, cracking or curling. Concrete slabs should be allowed to cure <br />adequately before placing vinyl or other moisture sensitive floor coverings. <br />6.6 Drainage <br />It is important that foundation soils not be allowed to become saturated during or <br />after construction. Furthermore, surface water must not be allowed to pond <br />adjacent to building foundations. To preclude drainage problems, we recommend <br />continuous roof gutter for the proposed structures. It will be necessary to direct <br />ail water collected from roof downspouts into closed conduits that lead to <br />acceptable discharge points away from the structures. <br />Grades should be such that drainage is away from the structures, Water and <br />sewer utility lines should be properly installed to avoid becoming possible sources <br />for subsurface saturation. It is important that all utility trenches be properly <br />backfilled. If practicable, planters and/or landscaping should not be adjacent to <br />or near the structures. If vegetation must be planted adjacent to or near <br />structures, plants that require very little moisture with drip irrigation systems <br />should be used. Sprinkler heads should not be placed where they could saturate <br />foundation soil. <br />6.7 Miscellaneous <br />Our exploration did not reveal the presence of buried items such as leaching <br />fields, wells, storage tanks, etc other than previously discussed. It is possible, <br />however, that such items may be present. If such items are encountered during <br />grading or during excavations of foundations, our firm should be notified <br />immediately to provide recommendations for proper procedures. Also, this study <br />did not include investigations for toxic substances or groundwater contamination <br />of any type. If such conditions are encountered during site development, <br />additional studies will be required. <br />i~ Korbmacher Engineering, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.