My WebLink
|
Help
|
About
|
Sign Out
16 ATTACHMENTS
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2007
>
030607
>
16 ATTACHMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/1/2007 8:45:53 AM
Creation date
2/28/2007 4:30:56 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
3/6/2007
DESTRUCT DATE
15 Y
DOCUMENT NO
16 Attachments
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
147
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project No. JB-569 <br />20 June 2006 <br />Revised 18 October 2006 <br />Page 10 <br />The gradient of the exposed outboard surface of the fill must not exceed 2H:1 V. <br />Additional recommendations may be made for fill slope construction depending <br />on the soil conditions encountered. Grading should be in accordance with the <br />Vineyard Avenue Corridor Specific Plan. <br />6.2 Foundations <br />6.2.1 Drilled Pier and Grade Beam Foundation System <br />Piers should be designed according to the criteria in Table 3. The load-carrying <br />capacity of the upper 2 feet of soil should be neglected in determining the <br />allowable pier capacity. To reduce the potential for differential settlement, we <br />recommend that all piers be cleaned of slough and loose material prior to placing <br />steel reinforcement and concrete. <br />The piers and grade beams should contain steel reinforcement over their entire <br />length with reinforcement as directed by the Project Structural Engineer according <br />to applicable UBC or American Concrete Institute standards. In no case, however, <br />should the grade beams contain less than two No. 4 reinforcing bars (or <br />equivalent steel areal in both the top and bottom of each beam, and the piers <br />should have no less than two No. 4 reinforcing bars. The reinforcement steel for <br />the pier should be tied into the top steel of the grade beam. <br />Due to the moderate to high expansion potential of the site soil, we recommend <br />the exterior grade beams be designed to resist a uniform upward pressure of <br />2,000 pounds per square foot. As an alternate, a void of approximately 4-inches <br />should be provided below the bottom of the grade beam and the subgrade. The <br />void may be replaced with a compressible material approved by our <br />representative. If raising the grade beam is not desired, the beams may consist <br />of a "knife-edge" formed at the bottoms of the beams with at least 30 degrees <br />from horizontal. For "knife-edged" beams, the uplift pressures should be halved <br />for design purposes. <br />Korbmacher Engineering, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.